2013
DOI: 10.1109/tpel.2012.2214061
|View full text |Cite
|
Sign up to set email alerts
|

Integrated Full-Bridge-Forward DC–DC Converter for a Residential Microgrid Application

Abstract: This paper proposes a novel integrated converter topology for interfacing between the energy storage system and the DC bus for a residential microgrid application. The proposed integrated full-bridge-forward DC-DC converter presents the following features: low number of active devices compared to the converters usually applied to similar applications, low input and output current ripple, high voltage ratio, bidirectional power flow, and galvanic isolation. A double-ended forward converter with particularities … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
25
0
2

Year Published

2014
2014
2022
2022

Publication Types

Select...
5
4

Relationship

0
9

Authors

Journals

citations
Cited by 77 publications
(27 citation statements)
references
References 26 publications
(29 reference statements)
0
25
0
2
Order By: Relevance
“…An ESS is attached to an inverter which is used to convert DC to AC for electricity transmission. A novel inverter for energy storage is proposed in [36,37]; the inverter is used to minimize the burden on the MG. However, the authors only considered the performance of practical DC and AC with ESSs, whereas energy exchange was not considered.…”
Section: Energy Management Using Heuristic Optimization Approachesmentioning
confidence: 99%
See 1 more Smart Citation
“…An ESS is attached to an inverter which is used to convert DC to AC for electricity transmission. A novel inverter for energy storage is proposed in [36,37]; the inverter is used to minimize the burden on the MG. However, the authors only considered the performance of practical DC and AC with ESSs, whereas energy exchange was not considered.…”
Section: Energy Management Using Heuristic Optimization Approachesmentioning
confidence: 99%
“…Novel inverter [36,37] Minimize the burden on MG Energy exchange is not considered FF, PSO, DE, GA, TLBO [38] MG operation cost minimization. Energy exchange is not considered.…”
mentioning
confidence: 99%
“…Such systems are being studied and applied in recent years, thanks to the development of power electronic apparatus [4]- [5]. The connection of an ac generator to a dc-bus can be obtained in several ways.…”
Section: Introductionmentioning
confidence: 99%
“…Muchas veces están conformados por dos etapas, donde la primer etapa es un convertidor tipo boost, encargado de elevar la tensión a un valor superior a la máxima tensión de entrada, el que alimenta con una tensión constante a la segunda etapa, encargada de proveer la aislación requerida por el sistema [1] [2]. Ambas etapas deben procesar la totalidad de la potencia de entrada, lo que va en demérito de la eficiencia.…”
Section: Introductionunclassified