2012
DOI: 10.4028/www.scientific.net/amm.248.511
|View full text |Cite
|
Sign up to set email alerts
|

Implementation of Lean Manufacturing System in Bogie Assembly in Railway Coach Factory

Abstract: Elimination of the non-value added activities in the bogie assembly shop during bogie assembly process. The various non-value added activities are found in the assembly shop such as excess distance between each assembly stages, excess cost to flow of material from one stage to another stage, waste of time and non-flexibility of shop. These types of non-value added activities occur due to the improper arrangement of bogie assembly stages. Implementation of lean manufacturing systems through layout design by the… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2014
2014
2019
2019

Publication Types

Select...
3

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 1 publication
0
2
0
Order By: Relevance
“…Excess products may be sold with reduced prices at the end of the industry fiscal year to match the budget or lower the inventory for the next year's production [19][20]. Producing more material than the customer demand or produce it before it is needed is termed as over production.…”
Section: Overproductionmentioning
confidence: 99%
“…Excess products may be sold with reduced prices at the end of the industry fiscal year to match the budget or lower the inventory for the next year's production [19][20]. Producing more material than the customer demand or produce it before it is needed is termed as over production.…”
Section: Overproductionmentioning
confidence: 99%
“…Best interchanges between the two stages were considered to the development of new proposed layout in which all the non-value added activities are eliminated. Yue [15] analysed the car-seat assembly line which has several problems such as productivity shortage, long production cycle and high inventory costs. Based on leap production, article introduced how to improve the car-seat assembly line with value stream mapping analysis, Kanban pull production management and process flow analysis.…”
Section: Introductionmentioning
confidence: 99%