2004
DOI: 10.1179/019713604806082483
|View full text |Cite
|
Sign up to set email alerts
|

Hunting Free and Bound Chloride in the Wrought Iron Rivets from the American Civil War SubmarineH. L. Hunley

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
6
0

Year Published

2012
2012
2019
2019

Publication Types

Select...
3
1
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(6 citation statements)
references
References 5 publications
0
6
0
Order By: Relevance
“…In addition to causing physical damage, the formation of akaganéite may have a direct impact on the chloride extraction effi ciency of traditional desalination techniques [1,4,13,15,32]. These studies have shown that some of the chloride ions are unable to be removed during treatment because they appear to remain locked inside the tunnel-like structure of the akaganéite.…”
Section: Conservation Objectives Treatment Rationale and Risk Managementioning
confidence: 99%
See 3 more Smart Citations
“…In addition to causing physical damage, the formation of akaganéite may have a direct impact on the chloride extraction effi ciency of traditional desalination techniques [1,4,13,15,32]. These studies have shown that some of the chloride ions are unable to be removed during treatment because they appear to remain locked inside the tunnel-like structure of the akaganéite.…”
Section: Conservation Objectives Treatment Rationale and Risk Managementioning
confidence: 99%
“…• Once exposed to air and allowed to dry before treatment, the solubility of the chloride ions drops signifi cantly, directly impacting the effi ciency of immersion treatments [1,4,13,15].…”
Section: Introductionmentioning
confidence: 99%
See 2 more Smart Citations
“…Notwithstanding the identification of the number of cycles which effectively decreases the released chloride amount, such a water leaching procedure is not easily applicable to the largest fragments of the statue. Moreover, in this experiment the rinsing cycles had a short duration (2 min cycle À1 ) whilst the process of removing chlorides for marine artifacts is often measured in days and years [31]. Therefore, the leaching process might not have been able to remove all the chlorides from the inner layers of the corrosion crust, as well as from the interface with the metal (were they can often be preferentially located, as shown in Fig.…”
Section: Elementmentioning
confidence: 99%