2017
DOI: 10.1007/978-3-319-63946-8_49
|View full text |Cite
|
Sign up to set email alerts
|

HBIM for the Archaeology of Standing Buildings: Case Study of the Church of San Cipriano in Castelvecchio Calvisio (L’Aquila, Italy)

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
17
0
1

Year Published

2018
2018
2022
2022

Publication Types

Select...
4
1
1

Relationship

1
5

Authors

Journals

citations
Cited by 14 publications
(18 citation statements)
references
References 5 publications
0
17
0
1
Order By: Relevance
“…The acronym HBIM (Historic Building Information Modeling) was used for the first time in 2009, hypothesizing a new system for modeling historical buildings starting from a survey of the existing (Murphy et al, 2009), exploiting the advantages offered by a semantic modeling based on parametric elements (Garagnani 2015) connected to each other through a hierarchical structure of smart objects (Scianna, 2018). Following numerous experimentations that have taken place over the last few years on the historical and archaeological heritage, often with different scopes, HBIM is becoming a consolidated practice (Della to document the state of artefacts (Continenza et al 2018); to analyze the phenomena to which they are subject; to study their constructive processes diachronically (Scandurra et al, 2017); to manage the restoration sites (Brumana et al 2017) and, last but not least, to monitor the evolution of artefacts over time. This last use, referred to as asbuilt BIM has become of fundamental importance because it allows, as for new buildings, the concrete possibility of monitoring, and managing, the changes of buildings over time.…”
Section: The Methodological Reasons Of the Hbim Of The Architectural mentioning
confidence: 99%
“…The acronym HBIM (Historic Building Information Modeling) was used for the first time in 2009, hypothesizing a new system for modeling historical buildings starting from a survey of the existing (Murphy et al, 2009), exploiting the advantages offered by a semantic modeling based on parametric elements (Garagnani 2015) connected to each other through a hierarchical structure of smart objects (Scianna, 2018). Following numerous experimentations that have taken place over the last few years on the historical and archaeological heritage, often with different scopes, HBIM is becoming a consolidated practice (Della to document the state of artefacts (Continenza et al 2018); to analyze the phenomena to which they are subject; to study their constructive processes diachronically (Scandurra et al, 2017); to manage the restoration sites (Brumana et al 2017) and, last but not least, to monitor the evolution of artefacts over time. This last use, referred to as asbuilt BIM has become of fundamental importance because it allows, as for new buildings, the concrete possibility of monitoring, and managing, the changes of buildings over time.…”
Section: The Methodological Reasons Of the Hbim Of The Architectural mentioning
confidence: 99%
“…In the United Kingdom, an organization called Historic England spearheads many conservation works of the country's heritage buildings by adopting this approach. In Italy, there are buildings such as the San Cipriano Church and St. Maria Church, which have been taken as HBIM case studies (Continenza, Redi Savini, Tata, & Trizio, 2018) to move forward with their culturally rich Roman buildings. In Turkey, there is an increasing awareness via summits and discussion to preserve Ottoman's empire architectural heritage within the region using the approach.…”
Section: Faculty Of Built Environment Universiti Teknologi Malaysiamentioning
confidence: 99%
“…HBIM is a project simulation consisting of the 3D models of the historic building's components with links to all required information including the description about individual components and its nature. In many cases, this denotes a beginning of a new approach where the details about historical components can be shared and communicated visually, which has previously only been available to persons who could 'read plans' (Continenza et al, 2018;Antonoupoulou, 2017). In essence, HBIM can be used as an archive, information resource and acts as a management tool to aid future investigations on projects and research (Baik, 2017;Volk, et al, 2014;Murphy et al, 2013).…”
Section: Faculty Of Built Environment Universiti Teknologi Malaysiamentioning
confidence: 99%
See 2 more Smart Citations