2014
DOI: 10.1631/jzus.c1400030
|View full text |Cite
|
Sign up to set email alerts
|

Generation maintenance scheduling based on multiple objectives and their relationship analysis

Abstract: In a market environment of power systems, each producer pursues its maximal profit while the independent system operator is in charge of the system reliability and the minimization of the total generation cost when generating the generation maintenance scheduling (GMS). Thus, the GMS is inherently a multi-objective optimization problem as its objectives usually conflict with each other. This paper proposes a multi-objective GMS model in a market environment which includes three types of objectives, i.e., each … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
20
0

Year Published

2016
2016
2018
2018

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 18 publications
(20 citation statements)
references
References 38 publications
(61 reference statements)
0
20
0
Order By: Relevance
“…Figure 3: Coordination procedure in a deregulated power system Since the opening up to competition, the GMS problem in deregulated power systems has been widely studied (Badri and Niazi, 2012;Barot and Bhattacharya, 2008;Billinton and Abdulwhab, 2003;Bisanovic et al, 2011;Chattopadhyay, 2004b,a;Conejo et al, 2005;Elyas et al, 2013;Eshraghnia et al, 2006;Feng et al, 2009;Fu et al, 2007;Geetha and Shanti Swarup, 2009;Han et al, 2011;Kim et al, 2005;Shahidehpour, 1999a,b, 2000b,a;Min et al, 2013;Wu et al, 2008;Zhan et al, 2014). The problem has globally the same constraints as for the vertically integrated case.…”
Section: Required Modificationsmentioning
confidence: 99%
See 4 more Smart Citations
“…Figure 3: Coordination procedure in a deregulated power system Since the opening up to competition, the GMS problem in deregulated power systems has been widely studied (Badri and Niazi, 2012;Barot and Bhattacharya, 2008;Billinton and Abdulwhab, 2003;Bisanovic et al, 2011;Chattopadhyay, 2004b,a;Conejo et al, 2005;Elyas et al, 2013;Eshraghnia et al, 2006;Feng et al, 2009;Fu et al, 2007;Geetha and Shanti Swarup, 2009;Han et al, 2011;Kim et al, 2005;Shahidehpour, 1999a,b, 2000b,a;Min et al, 2013;Wu et al, 2008;Zhan et al, 2014). The problem has globally the same constraints as for the vertically integrated case.…”
Section: Required Modificationsmentioning
confidence: 99%
“…These studies generally deal with a security-constrained GMS problem operating under a pool-based model or a regulated monopoly. However, profit maximization is a much more common objective (Barot and Bhattacharya, 2008;Bisanovic et al, 2011;Chattopadhyay, 2004b,a;Conejo et al, 2005;Elyas et al, 2013;Eshraghnia et al, 2006;Feng et al, 2009;Geetha and Shanti Swarup, 2009;Kim et al, 2005;Min et al, 2013;Wu et al, 2008;Zhan et al, 2014).…”
Section: Required Modificationsmentioning
confidence: 99%
See 3 more Smart Citations