1992
DOI: 10.1080/01446199200000039
|View full text |Cite
|
Sign up to set email alerts
|

Factors affecting a contractor's mark-up size decision in Saudi Arabia

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

2
28
0

Year Published

1994
1994
2020
2020

Publication Types

Select...
7
2
1

Relationship

0
10

Authors

Journals

citations
Cited by 54 publications
(34 citation statements)
references
References 27 publications
2
28
0
Order By: Relevance
“…Moselhi et al [12] developed a decision support system, which was for correct bid mark-up estimation. Studies were also conducted for Saudi Arabia contractors [13,14]. Shash [15] identified 55 factors that characterize bidding decision in the UK.…”
Section: Literature Surveymentioning
confidence: 99%
“…Moselhi et al [12] developed a decision support system, which was for correct bid mark-up estimation. Studies were also conducted for Saudi Arabia contractors [13,14]. Shash [15] identified 55 factors that characterize bidding decision in the UK.…”
Section: Literature Surveymentioning
confidence: 99%
“…The present study has examined the impact of contractor size on their attitudes towards the factors in uencing bid mark-up decisions in Singapore's construction industry. Ahmad and Minkarah (1988), Shash and Abdul-Hadi (1992) and Shash (1993) suggested that a thorough investigation of the underlying factors affecting the bid/no bid decision and bid mark-up decision is essential before attempting to develop a realistic bidding strategy. Lifson and Shaifer (1982) argued that knowing the importance of the factors in uencing the decision-making process would allow key and major decisions to be reviewed and discussed regularly.…”
Section: Introductionmentioning
confidence: 98%
“…While Rowland (1981) found that cost overrun rates increased with increase in the contract amount of construction projects from a study of Southern United States construction contracts. Shash and Abdulhadi (1992) have identified the factors affecting the accuracy of cost estimating in construction projects in Saudi Arabia. They found that the project characteristics are main affecting factors in cost deviation in construction projects.…”
Section: Literature Reviewmentioning
confidence: 99%