2007
DOI: 10.1016/j.buildenv.2005.11.016
|View full text |Cite
|
Sign up to set email alerts
|

A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

11
107
2

Year Published

2012
2012
2023
2023

Publication Types

Select...
5
4
1

Relationship

0
10

Authors

Journals

citations
Cited by 86 publications
(129 citation statements)
references
References 24 publications
11
107
2
Order By: Relevance
“…Research had been done by [2] with a research title A Frame Work for Contractors to Reach Strategically Correct Bid/no Bid and Mark-up Size Decisions. The goal to be achieved is to identify factors related to the final decision which made structuring in a hierarchy.…”
Section: A Previous Research Resultsmentioning
confidence: 99%
“…Research had been done by [2] with a research title A Frame Work for Contractors to Reach Strategically Correct Bid/no Bid and Mark-up Size Decisions. The goal to be achieved is to identify factors related to the final decision which made structuring in a hierarchy.…”
Section: A Previous Research Resultsmentioning
confidence: 99%
“…In this type of contracts, the first important decision of contractors is the bid/nobid decision, as the tendering is costly and time-consuming activity for construction companies. Several studies have investigated the affecting factors in bid decision, of which some are related to the marketing direction and strategies such as the project's contribution in increasing brand strength and market share, entering new market, and effect in referral markets [70]. If the contractor decided to bid, first they usually should participate in the prequalification process used by clients to evaluate the capability of contractors based on various parameters.…”
Section: Project-based Marketing Practicesmentioning
confidence: 99%
“…Contractors have placed different degrees of preference and sensitivity toward factors affecting their bidding decisions as reported in many survey studies (e.g. Shash, 1993;Ling, 2005;Egemen and Mohamed, 2007). As an illustration of the notion of heterogeneity, Oo, Drew and Lo (2010a) used an example of bidding competition for a school project.…”
Section: The Notion Of Heterogeneitymentioning
confidence: 99%