2019
DOI: 10.1016/j.compgeo.2018.11.011
|View full text |Cite
|
Sign up to set email alerts
|

Face stability analysis of a shallow tunnel in the saturated and multilayered soils in short-term condition

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
9
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
10

Relationship

1
9

Authors

Journals

citations
Cited by 72 publications
(9 citation statements)
references
References 44 publications
0
9
0
Order By: Relevance
“…(1) Interaction between cutter head and soil: some ground is lost in front of the cutter head of the EPB shield machine as it cuts and squeezes the soil [37][38][39][40]. e EPB shield machine cuts the soil according to the speed and torque of the cutter head.…”
Section: Influencementioning
confidence: 99%
“…(1) Interaction between cutter head and soil: some ground is lost in front of the cutter head of the EPB shield machine as it cuts and squeezes the soil [37][38][39][40]. e EPB shield machine cuts the soil according to the speed and torque of the cutter head.…”
Section: Influencementioning
confidence: 99%
“…As shown in Figure 4, the construction loadings considered in this model from the excavation face until the shield tail are in sequence of the face pressure [36], the friction force between the shield skin and the ground, the jacking force and the grouting pressure [37][38][39].…”
Section: Modelling Of Construction Loadingsmentioning
confidence: 99%
“…With the increasingly tense urban space, it is inevitable for an urban shield tunnel to cross under and side through the existing building structure. e disturbance impact on the surrounding building structure is a problem that must be considered in the shield construction of urban subway tunnel; aiming at the settlement disturbance analysis of surrounding buildings caused by shield construction of urban subway tunnel, scholars have analyzed such problems from the perspectives of construction monitoring [1][2][3], theoretical analysis [4][5][6][7][8], and numerical simulation [9][10][11][12][13]31]. ere are many related research results, most of which are lateral disturbance analysis of straight-line section shield, while there is less analysis on the disturbance of existing building structure caused by the construction of turning shield tunnel, the interaction mechanism between turning shield tunnel excavation and existing buildings is more complex, which is affected by turning radius, advance excavation volume, ground conditions, tunnel structural characteristics, relative space position between shield and tunnel, type of shield machine, shield construction parameters, and whole process [14][15][16][17][18].…”
Section: Introductionmentioning
confidence: 99%