2016
DOI: 10.1016/j.proeng.2016.11.790
|View full text |Cite
|
Sign up to set email alerts
|

Evaluating Contractors and Offered Structural Solution

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2017
2017
2018
2018

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 13 publications
(3 citation statements)
references
References 6 publications
0
3
0
Order By: Relevance
“…This is production which does not put the environment in jeopardy and meets the established standards and requirements of organizations which control environmental protection. But at that legislator did not prescribed what exactly should be understood as environmentally safe commodity-construction production (HCP, in our case) from the point of view of its impact on health of the people who lives there [7,8,9]. So, the states above allow to draw some conclusions: 1.…”
Section: Resultsmentioning
confidence: 92%
“…This is production which does not put the environment in jeopardy and meets the established standards and requirements of organizations which control environmental protection. But at that legislator did not prescribed what exactly should be understood as environmentally safe commodity-construction production (HCP, in our case) from the point of view of its impact on health of the people who lives there [7,8,9]. So, the states above allow to draw some conclusions: 1.…”
Section: Resultsmentioning
confidence: 92%
“…At the same time for small business product innovations (owing to a smaller capital intensity) and for an average -both product, and process innovations are primary. It should be noted that introduction of a number of innovations is inseparably linked with need of organizational or marketing transformations [3,4].…”
Section: Methodsmentioning
confidence: 99%
“…Although in the past few years, in developing countries especially in Uttar Pradesh, India, it is a common observation that construction activities being conducted by government and its subsidiary agencies prefer lowest bidder techniques to award a project for medium-scale projects. The contractor whose bidding price is the lowest will win the bid (Manu et al, 2015;Dražić et al, 2016;Elzomor and Parrish, 2016;Deep et al, 2017a;Dixit et al, 2017). The prequalification and bid assessment methods require the advancement of essential and adequate selection criteria (Palaneeswaran and Kumaraswamy, 2000).…”
Section: Introductionmentioning
confidence: 99%