Enhancing Total Transfer Capability via Optimal Location of TCSC in Deregulated Electricity Market

Abstract: Abstract. In deregulated electricity market, most of the power transferred through the wheeling transaction. Hence, it is very important and necessary to determine the transfer capability of the transmission system before the power dispatch. Series FACTS devices such as Thyristor controlled series compensators (TCSC), with its ability to directly control the power flow can be very effective to total transfer capability of transmission network. Proper location of TCSC plays key role in improving total transfer … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
4
0
1

Year Published

2019
2019
2020
2020

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(5 citation statements)
references
References 13 publications
0
4
0
1
Order By: Relevance
“…Các nghiên cứu cũng cho thấy, dù trong điều kiện nào thì khối lượng tính toán của các giải thuật là không nhỏ, và khi áp dụng trên các hệ thống điện lớn thì thời gian một lần tính toán có thể tính bằng ngày trở lên. Từ những năm đầu 2000s, giải thuật MFMC được một số nghiên cứu sử dụng trong hệ thống điện để xác định điểm tắc nghẽn trong hệ thống điện 13 , hoặc tìm vị trí đặt thiết bị điều khiển công suất phản kháng tối ưu 5,13 , cũng như nghiên cứu các ràng buộc, độ tin cậy trong quy hoạch mở rộng hệ thống truyền tải điện 14,15 . Ưu điểm của giải thuật MFMC là đơn giản và đặc biệt là tính toán khá nhanh so với các thuật toán tối ưu đã nêu nên được nhiều nhà nghiên cứu quan tâm.…”
Section: Giải Thuật Mfmcunclassified
“…Các nghiên cứu cũng cho thấy, dù trong điều kiện nào thì khối lượng tính toán của các giải thuật là không nhỏ, và khi áp dụng trên các hệ thống điện lớn thì thời gian một lần tính toán có thể tính bằng ngày trở lên. Từ những năm đầu 2000s, giải thuật MFMC được một số nghiên cứu sử dụng trong hệ thống điện để xác định điểm tắc nghẽn trong hệ thống điện 13 , hoặc tìm vị trí đặt thiết bị điều khiển công suất phản kháng tối ưu 5,13 , cũng như nghiên cứu các ràng buộc, độ tin cậy trong quy hoạch mở rộng hệ thống truyền tải điện 14,15 . Ưu điểm của giải thuật MFMC là đơn giản và đặc biệt là tính toán khá nhanh so với các thuật toán tối ưu đã nêu nên được nhiều nhà nghiên cứu quan tâm.…”
Section: Giải Thuật Mfmcunclassified
“…The variation of the line's flow due to series capacitance can be represented as a line without a series capacitance with flowing power at the injecting and receiving terminals of the line, as shown in ) can be obtained by (11) to (14) [26][27][28]:…”
Section: Modeling and Formulation Of Tcsc In Optimal Load Flow Equations 21 Static Modeling Of Tcscmentioning
confidence: 99%
“…In [13], a new method for the TCSC locating is presented in order to absorb the maximum transmittable power by the loads through the network's branches. In [14], the authors have focused on the transmission cost and improving it by installing the TCSC. In [15][16], an optimization method is proposed to find the best location to install TCSC regard to maximizing the loadability of the Malaysian distribution network based on evolutionary optimization technique.…”
Section: Introductionmentioning
confidence: 99%
“…Simulations results are compared with GA and GWO and show that the COA is one useful method for TCSC installation to maximize social welfare.Keywords-cuckoo optimization algorithm; FACTS; TCSC; social benefits; electricity market I.Recently, Flexible AC Transmission Systems (FACTS) [5] have also been utilized to solve the congestion problem and maximize social welfare. Many studies have been proposed for the improvement of existing power networks via optimal location of FACTS [6][7][8][9][10][11][12][13][14][15][16][17][18][19]. Interior point method was used for system expansion with UPFC to maximize social welfare and…”
mentioning
confidence: 99%
“…Recently, Flexible AC Transmission Systems (FACTS) [5] have also been utilized to solve the congestion problem and maximize social welfare. Many studies have been proposed for the improvement of existing power networks via optimal location of FACTS [6][7][8][9][10][11][12][13][14][15][16][17][18][19]. Interior point method was used for system expansion with UPFC to maximize social welfare and…”
mentioning
confidence: 99%