“…For instance, [10,28] proposed a methodology that coupled TCL and ABC costing methods, which were applied to industrial cases specific to use-oriented PSS. Along the same lines, [29] introduced a methodology for uncertainty assessment in PSS costing based on the Monte-Carlo simulation, which was complementary to the costing method reported in [28]. Moreover, [30,31] approached the problem of multi-actor integration from a PSS development angle, which however lacked detailed costing methods.…”