2013
DOI: 10.1016/j.ejor.2012.11.031
|View full text |Cite
|
Sign up to set email alerts
|

Economic and economic-statistical designs of an control chart for two-unit series systems with condition-based maintenance

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
18
0

Year Published

2013
2013
2022
2022

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 49 publications
(18 citation statements)
references
References 28 publications
0
18
0
Order By: Relevance
“…Then, the training of this methodology was carried out with the quality technical staff, and, later, the data were collected (D: do). The evaluation was made based on the data collected (C: Check), using the statistical process control, as proposed by Liu et al (2013). Then, an improvement plan was drawn up for billets harvest to improve or standardize the operation (A: action) ( Figure 1).…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…Then, the training of this methodology was carried out with the quality technical staff, and, later, the data were collected (D: do). The evaluation was made based on the data collected (C: Check), using the statistical process control, as proposed by Liu et al (2013). Then, an improvement plan was drawn up for billets harvest to improve or standardize the operation (A: action) ( Figure 1).…”
Section: Methodsmentioning
confidence: 99%
“…Phase 3: Check (C) -to verify the data collected, we used statistical process control tools, which are described by the individual charts, which monitor the process over time. In addition, the process capacity analysis (Cpk, Cp, Pp and Cpm) was carried out to detect whether it meets the standards established throughout the operation, when the process was considered stable (Liu et al, 2013).…”
Section: Phase 2: Do (D) -mentioning
confidence: 99%
“…Liu and Yu [37] studied the economic and economic-statistical designs of X control chart for a two-identical unit system. In addition, monitoring the mean value and the variance of quality characteristic simultaneously is also worth investigating for the future integrated model.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Xiang [22] proposed a model for a production process that deteriorates according to a discrete-time Markov chain and further provided a breakthrough in designing an efficient solution algorithm in obtaining analytical results. Liu et al [23] used a five-state continuous time Markov chain for a two-unit series system to find the optimal control chart parameters by minimizing the average maintenance costs. Zhang et al [24] proposed a delayed maintenance policy, estimated the state probabilities during the delayed period by Bayesian theory, and used Markov method to model the monitoring-maintenance process.…”
Section: Mathematical Problems In Engineeringmentioning
confidence: 99%