2014
DOI: 10.1016/j.procs.2014.03.055
|View full text |Cite
|
Sign up to set email alerts
|

Dynamic Planning of System of Systems Architecture Evolution

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2015
2015
2024
2024

Publication Types

Select...
6
1

Relationship

2
5

Authors

Journals

citations
Cited by 13 publications
(3 citation statements)
references
References 9 publications
0
3
0
Order By: Relevance
“…This allows us to set the planning horizon for the method used, which, as we can see from Figures 2 and 3, is shorter than the confidence planning horizon for individual parameters. It should be noted that the increase in the risk value is sharper compared to the assessment of individual parameters, which indicates that going beyond the horizon examined will almost certainly lead to management errors and the need for regular adjustment of plans (Fang and DeLaurentis, 2014).…”
Section: Resultsmentioning
confidence: 99%
“…This allows us to set the planning horizon for the method used, which, as we can see from Figures 2 and 3, is shorter than the confidence planning horizon for individual parameters. It should be noted that the increase in the risk value is sharper compared to the assessment of individual parameters, which indicates that going beyond the horizon examined will almost certainly lead to management errors and the need for regular adjustment of plans (Fang and DeLaurentis, 2014).…”
Section: Resultsmentioning
confidence: 99%
“…In the SoS context, Nusawardhana [31] employed ADP to a class of SoS problems that involves simultaneous design of a new system (e.g., aircraft) and allocation of the new system along with existing systems (e.g., airline fleet allocation) over a finite horizon. Fang and her coauthors [32][33][34] have also demonstrated the ability of ADP in supporting SoS evolution decision making for defense acquisition with proper assumptions. is paper continues leveraging the advantages of ADP in addressing complex multistage decision-making problems under uncertainty in the SoS context with more elements incorporated in the formulation.…”
Section: System-of-systems Evolutionmentioning
confidence: 99%
“…It is also crucial to include both the near-term and long-term objectives in the early design phase, planning in advance to improve the capability or reduce the cost in the long run. The Multi-Stakeholder Dynamic Optimization (MUSTDO) methodology, 23,24 as shown in the top graph of Fig. 3, supports the coordination of stakeholder conflict and inter-temporal conflict via an integration of transfer contract coordination mechanism and approximate dynamic programming (ADP).…”
Section: Multi-stakeholder Dynamic Optimization (Mustdo)mentioning
confidence: 99%