2020
DOI: 10.1061/(asce)cp.1943-5487.0000919
|View full text |Cite
|
Sign up to set email alerts
|

Development of Semantically Rich 3D Retrofit Models

Abstract: The use of Building Information Modelling (BIM) has gained considerable interest in new build projects. However, its use in existing assets has been limited to geometric models utilising Point Cloud Data (PCD) as the primary source of data. The inclusion of non-geometrical data from distributed sources in the geometric model to make it semantically rich has been fraught with considerable challenges. In this paper, an approach is proposed to provide a framework for generating semantically-rich parametric models… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
23
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
5

Relationship

3
2

Authors

Journals

citations
Cited by 7 publications
(25 citation statements)
references
References 62 publications
0
23
0
Order By: Relevance
“…COBie cannot be utilised in BIM-driven applications for generating BIM models as it cannot transfer geometries (Farias et al, 2015;Gui, Wang, Qiu, Gui, & Deconinck, 2019). On the other hand, the IFC data model cannot present all kinds of non-geometrical data involved in BIM models (Sadeghineko et al, 2019;Sadeghineko & Kumar, 2020). In this regard, commercial BIM applications largely suffer from the limitations of exchanging data and indirectly capturing 3D models of buildings, particularly existing assets that do not have an appropriate model.…”
Section: Information Exchange Within the Aec Industrymentioning
confidence: 99%
See 4 more Smart Citations
“…COBie cannot be utilised in BIM-driven applications for generating BIM models as it cannot transfer geometries (Farias et al, 2015;Gui, Wang, Qiu, Gui, & Deconinck, 2019). On the other hand, the IFC data model cannot present all kinds of non-geometrical data involved in BIM models (Sadeghineko et al, 2019;Sadeghineko & Kumar, 2020). In this regard, commercial BIM applications largely suffer from the limitations of exchanging data and indirectly capturing 3D models of buildings, particularly existing assets that do not have an appropriate model.…”
Section: Information Exchange Within the Aec Industrymentioning
confidence: 99%
“…In this regard, commercial BIM applications largely suffer from the limitations of exchanging data and indirectly capturing 3D models of buildings, particularly existing assets that do not have an appropriate model. Hence, some of the information that cannot be presented through existing information exchange standards and formats is inevitably stored in different file formats outside the model, such as PDF, 2D paper-based CAD drawings, and Excel spreadsheets (Sadeghineko & Kumar, 2020).…”
Section: Information Exchange Within the Aec Industrymentioning
confidence: 99%
See 3 more Smart Citations