“…First, in the planning and design phase (Y 1 ), BIM can be used for daylighting simulation [54] (Z 3 ) and security analysis [55] (Z 3 ). Second, in the construction phase (Y 2 ), BIM can be used for earned value management [56] (Z 2 ), cost/schedule estimation [57] (Z 2 ), and construction safety analysis [58] (Z 3 ). ird, in the operation and maintenance phase (Y 3 ), BIM can be used for daily management and emergency simulation analysis, such as energy simulation [43] (Z 1 ), user daily activity simulation [59] (Z 3 ), indoor environmental quality analysis [60] (Z 3 ), and fire personnel evacuation simulation [50]…”