Contractor’s bid pricing strategy: a model with correlation among competitors’ prices

Abstract: The approach used by construction companies to determine bid prices is an element of their strategy used to win jobs in competitive tenders. Such strategies build upon an analysis of the contactor’s potential and capabilities (am I able to deliver? am I eligible to participate in the tender?), and the analysis of the economic environment, including the expected behavior of competitors. The tender strategy sets out both the guidelines and the procedure in deciding whether or not to bid as well as the rules for … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
6
0
1

Year Published

2021
2021
2022
2022

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 12 publications
(7 citation statements)
references
References 33 publications
0
6
0
1
Order By: Relevance
“…Consequently, the project requirements are largely defined and delineated by the contractors' interpretations [6], thus increasing the difficulty of levelling bids, especially due to the inclusion of qualifications that form the basis of the tender return [7,8]. In addition, this approach reduces the clarity of procuring a contractor who has fully understood and allowed for the full extent of the scope of the works [9]. This lack of clarity in terms of scope, and the inherently competitive element of this procurement route, compel contractors to strategically plan their approach to each tender in order to increase the appeal of their tender return [10] and participate in the infamous "race to the bottom" [11].…”
Section: Introductionmentioning
confidence: 99%
“…Consequently, the project requirements are largely defined and delineated by the contractors' interpretations [6], thus increasing the difficulty of levelling bids, especially due to the inclusion of qualifications that form the basis of the tender return [7,8]. In addition, this approach reduces the clarity of procuring a contractor who has fully understood and allowed for the full extent of the scope of the works [9]. This lack of clarity in terms of scope, and the inherently competitive element of this procurement route, compel contractors to strategically plan their approach to each tender in order to increase the appeal of their tender return [10] and participate in the infamous "race to the bottom" [11].…”
Section: Introductionmentioning
confidence: 99%
“…Compared to the traditional approach, such as the low-bid approach to choosing a winner, DB seems to have significant advantages for sustainable green building objectives [40,41]. Many approaches have been improved since the 1990s to find a rating approach to handle green buildings properly [42]. To achieve a comprehensive vision of all aspects of the bid details and to meet the required conditions written in the contract to satisfy all parties, when determining the bid winner, it is vital to consider the quality, environment, technical aspects, reputation, and price.…”
Section: Literature Reviewmentioning
confidence: 99%
“…To achieve a comprehensive vision of all aspects of the bid details and to meet the required conditions written in the contract to satisfy all parties, when determining the bid winner, it is vital to consider the quality, environment, technical aspects, reputation, and price. This approach ensures that more work and effort is put into enforcing adequate and acceptable criteria for choosing the winner to attain the optimal advantage [16,41,42]. Many factors must be considered for the conceptual phase in the design and planning stages of the green building to acquire practical work [43].…”
Section: Literature Reviewmentioning
confidence: 99%
“…Jaśkowski e Czarnigowska ( 2019); Li et al (2019); Skitmore e Pemberton, (1993); Hwang e Kim (2015); Polat e Bingol (2017); SU et al (2019); Tian et al (2019).…”
Section: Métodos Baseados Em Múltiplos Critérios (11%)mentioning
confidence: 99%