Construction Delays in Clients Opinion – Multivariate Statistical Analysis

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
54
0
3

Year Published

2016
2016
2018
2018

Publication Types

Select...
9

Relationship

1
8

Authors

Journals

citations
Cited by 60 publications
(58 citation statements)
references
References 17 publications
1
54
0
3
Order By: Relevance
“…From the presented literature review and many previous several researches, five (5) delays were identified as common in many studies in different geographical areas and various types of construction industries (Aziz & Abdel-Hakam, 2013;Alzaraa, Kashiwagib, Kashiwagic & Al-Tassand, 2016;Durdyev et al, 2017;Zidane, Johansenb & Ekambaramb, 2015;Elawi, 2016;Doloi, Sawhney & Iyer, 2012;Gunduz & AbuHassan, 2016;Gluszak & Lesniak, 2015;Gunduz, Nielsen & Ozdemir, 2015). The selected five delay factors are:…”
Section: Critical Delays Reviewmentioning
confidence: 99%
“…From the presented literature review and many previous several researches, five (5) delays were identified as common in many studies in different geographical areas and various types of construction industries (Aziz & Abdel-Hakam, 2013;Alzaraa, Kashiwagib, Kashiwagic & Al-Tassand, 2016;Durdyev et al, 2017;Zidane, Johansenb & Ekambaramb, 2015;Elawi, 2016;Doloi, Sawhney & Iyer, 2012;Gunduz & AbuHassan, 2016;Gluszak & Lesniak, 2015;Gunduz, Nielsen & Ozdemir, 2015). The selected five delay factors are:…”
Section: Critical Delays Reviewmentioning
confidence: 99%
“…The publications of Anysz and Zbiciak (2013); Czarnigowska and Sobotka (2013); Głuszak and Leśniak (2015) and Leśniak and Piskorz (2017) involve attempts made by various researchers to identify the factors infl uencing works delays in the opinion of contractors. Work by Leśniak (2012) proves that, according to contractors, the most signifi cant factors that generate delays include mistakes in project documentation, the investor's slow decision-making process and a low quality of management and supervision of the construction site.…”
Section: Causes Of Delays In Construction Work In Previous Researchmentioning
confidence: 99%
“…The paper by Jaśkowski and Biruk (2010) analysed the results of the research into the time risk factors in Poland. Some of the Polish publications also present the possibilities of applying various methods to analyse delay-causing factors: using the Dematel method (Dytczak, Ginda & Wojtkiewicz, 2011), factor analysis (Głuszak & Leśniak, 2015) or propose models and methods that can be used to effectively and reliably estimate the time of implementation of construction projects (Skorupka, 2008;Połoński & Pruszyński, 2013;Ibadov & Kulejewski, 2015;Krzemiński, 2016).…”
Section: Causes Of Delays In Construction Work In Previous Researchmentioning
confidence: 99%
“…Głuszak and Leśniak (2015) analysed the main causes of late performance of construction contract works, among which the following were determined as the most important: errors in design documentation, personnel qualification, weather conditions, poor supervision of construction works, and lax control and monitoring of construction works. Most causes are evaluated in the set of criteria developed by the authors, which sets forth the builder's contractual civil liability for the quality of works.…”
Section: Time Limits For Performance Of Workmentioning
confidence: 99%