2018 IEEE 9th International Workshop on Applied Measurements for Power Systems (AMPS) 2018
DOI: 10.1109/amps.2018.8494887
|View full text |Cite
|
Sign up to set email alerts
|

Calibration of Synchronized Measurement System: from the Instrument Transformer to the PMU

Abstract: Even if their deployment in electrical medium voltage networks was not as extensive as could be expected at the beginning, Phasor Measurement Units are key elements for Smart Grid operation. An impressive amount of papers discusses their implementation and usefulness in medium voltage network and almost as many deals with their metrological characterization. Although it is well known that instrument transformers are the main source of uncertainty in PMU-based synchronized measurements, this topic is not suffic… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
17
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 20 publications
(18 citation statements)
references
References 9 publications
0
17
0
Order By: Relevance
“…As for the random errors, vector ij is the vector of the six equivalent random errors associated with the six equivalent measurements in (10). ij is obtained from the voltage and current random errors by a matrix multiplication, using the same submatrices H ξ,α ij and H η,ψ ij as before.…”
Section: B Line Voltage Drop Equationsmentioning
confidence: 99%
See 2 more Smart Citations
“…As for the random errors, vector ij is the vector of the six equivalent random errors associated with the six equivalent measurements in (10). ij is obtained from the voltage and current random errors by a matrix multiplication, using the same submatrices H ξ,α ij and H η,ψ ij as before.…”
Section: B Line Voltage Drop Equationsmentioning
confidence: 99%
“…, it is necessary to estimate the state x ij . The main idea is to use multiple measurement sets corresponding to different timestamps (giving us different equations (10), one for each time-tag t). In the next sections additional constraints are discussed and the estimation algorithm is presented in detail.…”
Section: B Line Voltage Drop Equationsmentioning
confidence: 99%
See 1 more Smart Citation
“…Instead, the LPITs' calibration scenario is quite limited, but increasing day-by-day. For example, calibration techniques for electronic transformers are presented in studies by Tong et al [14] and Cayci and Kefeli [15], while in some studies [16][17][18][19][20] both current and voltage LPITs are tested at rated and off-nominal conditions. Finally, particular attention is given to the calibration of Rogowski coils and low-power current transformers (LPCTs) in other studies [21][22][23][24].…”
Section: Introductionmentioning
confidence: 99%
“…The solution to the synchronization problem consists in this case in the direct triggering of the DAQ acquisition by using the PPS from the GPS module. The authors also discuss the calibration of such device over the entire signal chain, from the instruments transformer to the PMU [16]. A recent evolution of the same device relies [17] on a dedicated conversion stage rather than on a third party DAQ, on an innovative software PLL based on a Kernel module and on the use of the internal pulse width modulation block (PWM) to generate the sampling base.…”
Section: Introductionmentioning
confidence: 99%