2017
DOI: 10.1016/j.proeng.2017.01.343
|View full text |Cite
|
Sign up to set email alerts
|

Building Information Modeling in the Architecture-engineering Construction Project in Surabaya

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0
1

Year Published

2017
2017
2023
2023

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 10 publications
(5 citation statements)
references
References 1 publication
0
4
0
1
Order By: Relevance
“…R1 [ 17 ], R2 [ 18 ], R3 [ 19 ], R4 [ 10 ], R5 [ 20 ], R6 [ 21 ], R7 [ 22 ], R8 [ 23 ], R9 [ 24 ], R10 [ 25 ], R11 [ 26 ], R12 [ 13 ], R13 [ 27 ], R14 [ 28 ], R15 [ 29 ], R16 [ 30 ], R17 [ 31 ], R18 [ 32 ], R19 [ 26 ], R20 [ 33 ], R21 [ 34 ], R22 [ 35 ], R23 [ 36 ], R24 [ 37 ], R25 [ 38 ], R26 [ 39 ], R27 [ 40 ], R28 [ 41 ], R29 [ 42 ], R30 [ 43 ], R31 [ 44 ], R32 [ 45 ], R33 [ 46 ], R34 [ 47 ], R35 [ 48 ], R36 [ 49 ], R37 [ 50 ], R38 [ 51 ], R39 [ 52 ], R40 [ 53 ], R41 [ 54 ], R42 [ 55 ], R43 [ 56 ], R44 [ 57 ], 45 [ 58 ], 46 [ 59 ], R47 [ 60 ], R48 [ 61 ], R49 [ 62 ], R50 [ 63 ], R51 [ 64 ], R52 [ 65 ], R53 [ 66 ], R54 [ 67 ], R55 [ 68 ], R56 [ 69 ], R57 [ 70 ], R58 [ 71 ], R59 [ 72 ], R60 [ 73 ], R61 [ 74 ], R62 [ 75 ], R63 [ 76 ], R64 [ 77 ], R65 [ 78 ], R66 [ 79 ], R67 [ ...…”
Section: Resultsmentioning
confidence: 99%
“…R1 [ 17 ], R2 [ 18 ], R3 [ 19 ], R4 [ 10 ], R5 [ 20 ], R6 [ 21 ], R7 [ 22 ], R8 [ 23 ], R9 [ 24 ], R10 [ 25 ], R11 [ 26 ], R12 [ 13 ], R13 [ 27 ], R14 [ 28 ], R15 [ 29 ], R16 [ 30 ], R17 [ 31 ], R18 [ 32 ], R19 [ 26 ], R20 [ 33 ], R21 [ 34 ], R22 [ 35 ], R23 [ 36 ], R24 [ 37 ], R25 [ 38 ], R26 [ 39 ], R27 [ 40 ], R28 [ 41 ], R29 [ 42 ], R30 [ 43 ], R31 [ 44 ], R32 [ 45 ], R33 [ 46 ], R34 [ 47 ], R35 [ 48 ], R36 [ 49 ], R37 [ 50 ], R38 [ 51 ], R39 [ 52 ], R40 [ 53 ], R41 [ 54 ], R42 [ 55 ], R43 [ 56 ], R44 [ 57 ], 45 [ 58 ], 46 [ 59 ], R47 [ 60 ], R48 [ 61 ], R49 [ 62 ], R50 [ 63 ], R51 [ 64 ], R52 [ 65 ], R53 [ 66 ], R54 [ 67 ], R55 [ 68 ], R56 [ 69 ], R57 [ 70 ], R58 [ 71 ], R59 [ 72 ], R60 [ 73 ], R61 [ 74 ], R62 [ 75 ], R63 [ 76 ], R64 [ 77 ], R65 [ 78 ], R66 [ 79 ], R67 [ ...…”
Section: Resultsmentioning
confidence: 99%
“…The range of values covers the entire domain of real numbers. Using the established evaluation level criteria of the multi-indicator system, the correlation degree of the elements to be evaluated for a certain level was found according to the correlation function (Chandra et al. , 2017).…”
Section: Constructing Bim Benefit Evaluation Modelmentioning
confidence: 99%
“…The range of values covers the entire domain of real numbers. Using the established evaluation level criteria of the multiindicator system, the correlation degree of the elements to be evaluated for a certain level was found according to the correlation function (Chandra et al, 2017). The weights of the matter element extension model and the entropy weight method modified by AHP were used to calculate the relevance of the owner-based BIM benefit evaluation at different levels with the following equation:…”
Section: 22mentioning
confidence: 99%
“…Adopsi digital pada sektor konstruksi di Indonesia berjalan lebih lamban jika dibandingkan dengan sektor lain, khususnya penggunaan BIM bahkan penggunaan BIM pada industri konstruksi bisa dikatakan belum matang ( wong et al, 2013) hal ini diperkuat oleh pernyataan (raflis et al, 2017) bahwa dalam proses kolaborasi desain di Jawa tengah tidak menemukan bukti adanya penggunaan suatu sistem digital, berbedadengan yang terjadi di perusahaan-perusahaan BUMN atau perusahaan swasta yang besar, sebagian perusahaan BUMN maupun swasta di Indonesia khususnyaDKI Jakarta telah menggunakan BIM pada proses desain maupun konstruksinya. Penggunaan BIM sendiri di Indonesia masih cukupbaru, begitu jugadengan penelitian-penelitian tentang BIM di Indonesia masih sedikit, salahsatunya penelitian oleh (Chandra et al 2017). Banyak penelitian tentang BIM dilakukan diluar Indonesia baik olehak ademisi ( Lee, 2008;Maunula, 2008;Succar, 2009 ) oleh tim professional (McGraw-Hill, 2008 ; BSI, 2010 ) atau oleh vendor perangkatlunak ( Autodesk, 2007 ), akan tetapi masih sedikit yang membahas tentang manfaat penggunaan BIM sendiris ebagai media komunikasi pada proses kolaborasi stakeholders dalam dunia konstruksi.…”
Section: Pendahuluanunclassified