2011
DOI: 10.1016/j.fusengdes.2010.12.002
|View full text |Cite
|
Sign up to set email alerts
|

Bolted coil support at the W7-X module interface

Abstract: The paper presents an overview of the design, finite element (FE) analysis results, tests, and assembly strategy of the bolted connection between the coils of neighboring W7-X modules. The design is based on an accurately machined bridge and allows the accommodation of expected misalignments of the coil positions up to ±23 mm and 1 deg. The joint is capable to cope with forces up to 1.3 MN and moments up to 0.2 MNm. Loads are transmitted by a combination of form lock provided by tapered coil block shoulders, a… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0

Year Published

2011
2011
2020
2020

Publication Types

Select...
5

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(7 citation statements)
references
References 6 publications
0
7
0
Order By: Relevance
“…An aluminium dummy was produced first, then trial installation followed, and the fit was measured. With this geometry-correction the stainless steel "bridge" was finally fabricated and the coil transition part underwent a finite element (FE) structural analysis [28].…”
Section: Structural Stability Of the Superconducting Coil Systemmentioning
confidence: 99%
“…An aluminium dummy was produced first, then trial installation followed, and the fit was measured. With this geometry-correction the stainless steel "bridge" was finally fabricated and the coil transition part underwent a finite element (FE) structural analysis [28].…”
Section: Structural Stability Of the Superconducting Coil Systemmentioning
confidence: 99%
“…Additional supports are stiffening the neighboring coils at this location. Of those, the two lateral supports, need a precise form-lock with the coil body ensuring a remaining gap of less than 50 µm before the connection is tightened [9]. For that, the wedge-shaped contact contour at every coil is laser scanned and their position is laser tracker measured.…”
Section: The Connection Of the Modules To The Torusmentioning
confidence: 99%
“…The test program for the magnet system has been successfully completed by tests of EKagrip® friction enhancing foils for elements to be installed at the module separation interface [26].…”
Section: 3mentioning
confidence: 99%
“…[26]), the support of assembly processes, reliable prediction of the stellarator structural behaviour at the maximum design value of 3T, establishing limits for machine operation, and study of new plasma scenarios and operational regimes. A further task is structural simulation of fault scenarios with deduction of corresponding operation instructions.…”
Section: Current and Future Activitiesmentioning
confidence: 99%
See 1 more Smart Citation