2021
DOI: 10.3389/fenrg.2021.700069
|View full text |Cite
|
Sign up to set email alerts
|

Automatic Generation Control for Distributed Multi-Region Interconnected Power System with Function Approximation

Abstract: Solving the energy crisis and environmental pollution requires large-scale access to distributed energy and the popularization of electric vehicles. However, distributed energy sources and loads are characterized by randomness, intermittence and difficulty in accurate prediction, which bring great challenges to the security, stability and economic operation of power system. Therefore, this paper explores an integrated energy system model that contains a large amount of new energy and combined cooling heating a… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(2 citation statements)
references
References 39 publications
(31 reference statements)
0
2
0
Order By: Relevance
“…Load transfer capacity (Feng et al, 2015;Zhao and Wu, 2016) is insufficient, and the 10kV line utilization rate (Zhang and Dou, 2018;Xiao and She, 2019) is generally low. The impact of new elements such as distributed energy and microgrid system (Chen and Liu, 2020;Zhou et al, 2021a;Liu et al, 2021;Zhang and Troitzsch, 2021) on the relay protection of the distribution network (Xu, 2017) is not considered. There are more dedicated line users in direct substations, which affects the 10kV line interval utilization (Hu and Li, 2017), etc.…”
Section: Introductionmentioning
confidence: 99%
“…Load transfer capacity (Feng et al, 2015;Zhao and Wu, 2016) is insufficient, and the 10kV line utilization rate (Zhang and Dou, 2018;Xiao and She, 2019) is generally low. The impact of new elements such as distributed energy and microgrid system (Chen and Liu, 2020;Zhou et al, 2021a;Liu et al, 2021;Zhang and Troitzsch, 2021) on the relay protection of the distribution network (Xu, 2017) is not considered. There are more dedicated line users in direct substations, which affects the 10kV line interval utilization (Hu and Li, 2017), etc.…”
Section: Introductionmentioning
confidence: 99%
“…The peak overshoot and time settling of the system should be kept as low as possible to ensure reliable system operation. (Liu et al, 2021;Ali et al, 2022;Liu et al, 2022).…”
Section: Introductionmentioning
confidence: 99%