Proceedings of the the 1st International Conference on Computer Science and Engineering Technology Universitas Muria Kudus 2018
DOI: 10.4108/eai.24-10-2018.2280502
|View full text |Cite
|
Sign up to set email alerts
|

Analysis of Girder PCU Subcontractor Selection Method with Analytical Network Process (ANP) (Case Study: Musi IV Bridge Project)

Abstract: Abstrak. Finding capable and reliable subcontractors is the ideal for the main contractor in completing the project. The project performance of the winning contractor often disappoints the main contractor, indicated by the delay in work, the non-completion of the work, or the quality of work that is below the established standards. To overcome this problem, a subcontractor selection model is made with various criteria that can be used as a basis for determining the winner with Analytic Network Process (ANP). T… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles