2020
DOI: 10.32672/jse.v5i2.1957
|View full text |Cite
|
Sign up to set email alerts
|

Analisis Risiko Potensi Bahaya dan Pengendaliannya Dengan Metode HIRADC pada PT. IGASAR Kota Padang Sumatera Barat

Abstract: <p>PT IGASAR was one of the companies affiliated with PT Semen Padang with business activities in the fields of engineering, cement distribution, transportation, heavy equipment rental, cement-based building materials industry, manufacturing, general contractor, and developer. Some work accidents were still found in activities at this company. It was essential to making hazard identification, risk assessment, and determined the type of control in some areas. There are work accidents in PT IGASAR in as ma… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
2
0
4

Year Published

2020
2020
2023
2023

Publication Types

Select...
7

Relationship

1
6

Authors

Journals

citations
Cited by 9 publications
(9 citation statements)
references
References 2 publications
0
2
0
4
Order By: Relevance
“…Namun tingkat keparahannya, besar kecilnya risiko tersebut tergantung dari bentuk tempat kerja seperti teknologi, alat hingga pada bagaimana perusahaan tersebut mengendalikan risiko bahayanya [7] [8]. Risiko kecelakaan didefinisikan secara sederhana adalah suatu kondisi gabungan dari kemungkinan terjadinya suatu kejadian yang memiliki dampak negatif dari kejadian tersebut [9]. Oleh karena itu, dalam bekerja sudah menjadi kewajiban perusahaan dalam memberikan rasa aman, nyaman kepada karyawan dalam melakukan pekerjaannya.…”
Section: Pendahuluanunclassified
“…Namun tingkat keparahannya, besar kecilnya risiko tersebut tergantung dari bentuk tempat kerja seperti teknologi, alat hingga pada bagaimana perusahaan tersebut mengendalikan risiko bahayanya [7] [8]. Risiko kecelakaan didefinisikan secara sederhana adalah suatu kondisi gabungan dari kemungkinan terjadinya suatu kejadian yang memiliki dampak negatif dari kejadian tersebut [9]. Oleh karena itu, dalam bekerja sudah menjadi kewajiban perusahaan dalam memberikan rasa aman, nyaman kepada karyawan dalam melakukan pekerjaannya.…”
Section: Pendahuluanunclassified
“…After knowing the risks that have the potential to cause losses, then a mitigation strategy is needed to overcome them. Risk analysis produces data and information in the form of risk levels which are then used to evaluate risks and formulate actions to deal with risks that may occur [26].…”
Section: Exploring Potential Risk Factors Of Bali Cattle Farmingmentioning
confidence: 99%
“…Ini harus mencakup jadwal untuk peningkatan esensial serta pembaruan peralatan dalam kegiatan konstruksi. Ini penting untuk efisiensi biaya, keamanan serta untuk menghindari kerusakan dan kerusakan material (Ihsan, 2020). Selain itu guna memastikan bahwa program keselamatan yang berhasil dilaksanakan di lokasi, kondisi berikut harus dibuat (Sharma, 2015): (1) Komitmen Manajemen; ini termasuk kepemimpinan, visi, dan arah, pernyataan tujuan, komitmen, pengawasan, analisis keselamatan, dan perencanaan pencegahan; (2) Kondisi Kerja yang Aman; ini termasuk tata graha yang tepat, tata letak situs yang tepat, dan ketersediaan ruang; (3) Kebiasaan Kerja yang Aman; ini termasuk kesadaran, komunikasi yang baik, sikap pribadi, budaya keselamatan, kelompok positif dan kompetensi pribadi.…”
Section: Hasil Dan Pembahasanunclassified