2015
DOI: 10.1016/j.eswa.2015.06.004
|View full text |Cite
|
Sign up to set email alerts
|

A two-stage artificial bee colony algorithm scheduling flexible job-shop scheduling problem with new job insertion

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
49
0
2

Year Published

2016
2016
2024
2024

Publication Types

Select...
5
5

Relationship

0
10

Authors

Journals

citations
Cited by 170 publications
(51 citation statements)
references
References 35 publications
0
49
0
2
Order By: Relevance
“…For assembly-line scheduling problem, there are swarm optimization algorithm [35], genetic algorithm [36], migratory bird optimization algorithm [37], hybrid algorithm [38,39], and so on. As for the current popular multi-variety and small-batch personalized customized production process, scheduling optimization is more widely applied and the corresponding research results are quite abundant [40][41][42][43]. However, these traditional scheduling methods consider separately processing and assembly, and the product is divided into multi jobs, the constraint relationships with the process are ignored.…”
Section: Introductionmentioning
confidence: 99%
“…For assembly-line scheduling problem, there are swarm optimization algorithm [35], genetic algorithm [36], migratory bird optimization algorithm [37], hybrid algorithm [38,39], and so on. As for the current popular multi-variety and small-batch personalized customized production process, scheduling optimization is more widely applied and the corresponding research results are quite abundant [40][41][42][43]. However, these traditional scheduling methods consider separately processing and assembly, and the product is divided into multi jobs, the constraint relationships with the process are ignored.…”
Section: Introductionmentioning
confidence: 99%
“…Many methods have been presented to solve the FJSP problem, e.g. exact methods [6,5,1], and heuristic methods [15,17,7,11,13,14].…”
Section: Introductionmentioning
confidence: 99%
“…Authors considered time as main QoS factor. Algorithm produced best total task finishing time, mean task finishing time and load balancing time as compared with ACO.In [23], authors proposed Two-stage Artificial Bee Colony (TABC) algorithm for scheduling andrescheduling with new job(s) inserting. The algorithm is compared with six simple heuristics and proposed hybrid heuristics.…”
Section: Artificial Bee Colony (Abc)mentioning
confidence: 99%