A Study of Construction Claim Management Problems in Malaysia

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
54
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
5
3
1

Relationship

0
9

Authors

Journals

citations
Cited by 56 publications
(54 citation statements)
references
References 8 publications
0
54
0
Order By: Relevance
“…They are categorized according to the three quality management processes of a project defined by PMI. (Gonzáles, Solís, & Alcudia, 2010), (Peña, Noll, & López, 2011), (Chileshe & Yirenkyi-Fianco,2011), (Pavez, 2012), (Ruqaishi & Bashir, 2013), (Bakhary et al, 2015), (Alsuliman, 2019) P2 Incompatibility between planes of different specialties (Risner, 2010), (Bramble & Callahan, 2011), (Dutdyev et al, 2013) P3 Low level of detail and low accuracy (Peña, Noll, & López, 2011), (Marzouk et al ,2013), (El-Khalek et al, 2018), (Alsuliman, 2019) P4 Poorly defined responsibilities and roles (Bramble & Callahan, 2011), (Henon, 2015), (Bakhary et al, 2015) P5 Poorly defined administrative bases and/or documents (Shane et al, 2009), (Henon, 2015), (Bakhary et al, 2015), (Alsuliman, 2019) P6 Ignorance of rights of project participants (Henon, 2015) P7 Lack of formality during contract administration (Mortaleb & Kishk, 2010), (Peña, Noll, & López, 2011), (Bramble & Callahan, 2011), (Dutdyev et al, 2013), (Marzouk et al ,2013), (Ruqaishi & Bashir, 2013), (Amoatey et al, 2015), (El-Khalek et al, 2018) P8 No master plan, resulting in insufficient overall planning (Henon, 2015) MANAGING QUALITY…”
Section: Problems Associated With Quality and Its Inspection In Constmentioning
confidence: 99%
See 1 more Smart Citation
“…They are categorized according to the three quality management processes of a project defined by PMI. (Gonzáles, Solís, & Alcudia, 2010), (Peña, Noll, & López, 2011), (Chileshe & Yirenkyi-Fianco,2011), (Pavez, 2012), (Ruqaishi & Bashir, 2013), (Bakhary et al, 2015), (Alsuliman, 2019) P2 Incompatibility between planes of different specialties (Risner, 2010), (Bramble & Callahan, 2011), (Dutdyev et al, 2013) P3 Low level of detail and low accuracy (Peña, Noll, & López, 2011), (Marzouk et al ,2013), (El-Khalek et al, 2018), (Alsuliman, 2019) P4 Poorly defined responsibilities and roles (Bramble & Callahan, 2011), (Henon, 2015), (Bakhary et al, 2015) P5 Poorly defined administrative bases and/or documents (Shane et al, 2009), (Henon, 2015), (Bakhary et al, 2015), (Alsuliman, 2019) P6 Ignorance of rights of project participants (Henon, 2015) P7 Lack of formality during contract administration (Mortaleb & Kishk, 2010), (Peña, Noll, & López, 2011), (Bramble & Callahan, 2011), (Dutdyev et al, 2013), (Marzouk et al ,2013), (Ruqaishi & Bashir, 2013), (Amoatey et al, 2015), (El-Khalek et al, 2018) P8 No master plan, resulting in insufficient overall planning (Henon, 2015) MANAGING QUALITY…”
Section: Problems Associated With Quality and Its Inspection In Constmentioning
confidence: 99%
“…Excessive rotation of design and construction project groups (Rounds & Chi, 1985), (Mezher & Tawil,1998) G2 Lack of comprehensive standards for quality evaluation and control (Chan & Choi, 2015) G3 Differences in criteria between design performers and field construction personnel (Pavez, 2012), (Kazaz et al, 2012), (Ruqaishi & Bashir, 2013), (Bakhary et al, 2015) G4 Methodologies with low feedback (Othman, 2011), (Chileshe & Yirenkyi-Fianco,2011), Amoatey et al, 2015) QUALITY CONTROL…”
Section: G1mentioning
confidence: 99%
“…Burati et al (1992), stressed that rework costs are a significant portion of total costs. In addition, Bakhary et al (2015) found that design changes being introduced at the post-tender stage is the main reason for claims, whileYap et al 2017found that an indirect effects of design changes and rework are a notable delay and disruption as well as unneccasry claim and dispute.…”
Section: Impact Of Design Changes On Project Performancementioning
confidence: 99%
“…In addition, it is confirmed by Malaysian Economic Transformation Program. 15,16 Aforementioned issues and huge amounts of money and time to avert dispute problems and risk of litigation encourage the researchers to develop more efficient ways of resolving disputes.…”
Section: Introductionmentioning
confidence: 99%