2021
DOI: 10.26686/wgtn.14393696
|View full text |Cite
Preprint
|
Sign up to set email alerts
|

A critical analysis of benefits and challenges of implementing modular integrated construction

Abstract: No description supplied

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
4

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(5 citation statements)
references
References 0 publications
0
5
0
Order By: Relevance
“…This stage acts as a bridge between initial and final stages of MiC implementation. Although the success of this stage lies in effective collaboration and communication between project participants, suitable procurement strategies for materials, effective resource planning and scheduling and utilizing just-in-time methods for module production among others, there are certain risks factors that can affect this stage [43]. Dimensional conflicts between modules, defective design and information gaps, frequently changing orders from clients, inadequate inspection procedures, scheduling errors causing rework and low capabilities of manufacturers among other things, are some of the risk factors that hinder the factory production stage of the MiC method [44].…”
Section: Modular Integrated Constructionmentioning
confidence: 99%
“…This stage acts as a bridge between initial and final stages of MiC implementation. Although the success of this stage lies in effective collaboration and communication between project participants, suitable procurement strategies for materials, effective resource planning and scheduling and utilizing just-in-time methods for module production among others, there are certain risks factors that can affect this stage [43]. Dimensional conflicts between modules, defective design and information gaps, frequently changing orders from clients, inadequate inspection procedures, scheduling errors causing rework and low capabilities of manufacturers among other things, are some of the risk factors that hinder the factory production stage of the MiC method [44].…”
Section: Modular Integrated Constructionmentioning
confidence: 99%
“…A number of studies promoted the sustainable benefits of MiC when compared to traditional construction methods [13,42,58,59], while others identified the obstacles hindering MiC implementations to support green and sustainability objectives [60,61]. For instance, Nahmens and Ikuma [43] examined the effects of MiC on different dimensions of sustainability, highlighting the way this construction method had a significant positive environmental impact by reducing material waste by 64%, a considerable social impact by avoiding unnecessary critical safety hazards such as excessive force, bad posture, and struck-by incidents, and a considerable economic effect by cutting production hours by 31%.…”
Section: Sustainable Operation Of Micmentioning
confidence: 99%
“…The growing popularity of this construction technique has attracted the attention of researchers, who have examined a number of different aspects of MiC in recent years. There is now an extensive literature on this topic, including studies on associated costincreasing risk factor in MiC implementation [11], the reductions in greenhouse gas emissions achieved [12], and the benefits and barriers of implementing MiC [13][14][15]. The huge volume of work published in this field in the last few years highlights the need for a systematic analysis of the literature to identify the key research themes, the contributions made by authors in various countries, and to qualitatively analyze these contributions.…”
Section: Introductionmentioning
confidence: 99%
“…Equation (4) shows that the indirect costs include the overheads (CIC) and the mobilization and demobilization costs (MC) of each piece of equipment and human resource used in the production, logistics and installation processes. The latter is calculated using Equation (5). The second cost component is the direct cost (DC) associated with the production, logistics and installation processes.…”
Section: Objective Functions and Constraintsmentioning
confidence: 99%
“…Off-site construction (OSC) is a sustainable construction method in which parts of the structure are produced off-site and then transported to the construction site for erection [1,2]. OSC has many advantages for the improvement of productivity [3], quality [4], and safety [5] of the built environment. Besides this, OSC brings environmental improvements to the construction industry [6].…”
Section: Introductionmentioning
confidence: 99%