2016
DOI: 10.1016/j.seppur.2016.04.019
|View full text |Cite
|
Sign up to set email alerts
|

A cost assessment study for a large-scale water gas shift catalytic membrane reactor module in the presence of uncertainty

Abstract: A comprehensive economic performance evaluation framework for an actual large-scale watergas-shift Pd-based catalytic membrane reactor (CMR) module for hydrogen production is presented. Since a detailed assessment of the technical performance of the CMR built at WPI has been reported previously [1], the present research study focuses on an assessment of the module's economic performance characteristics, and thus, can be viewed as complementary. The proposed evaluation framework encompasses comprehensive baseli… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
19
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 26 publications
(19 citation statements)
references
References 31 publications
0
19
0
Order By: Relevance
“…Fixed Capital Investment (FCI) encompassing both direct and indirect costs [31,32]. In particular, for the integration of the Pd/alloy-based CMR module into the above hydrogen production plant, cost components associated with direct costs involve purchased equipment (including WGS reactors, HTS catalysts, and Pd/Au alloy composite membrane tubes), installation, installed instrumentation and controls, installed piping, installed electrical units, buildings, process and auxiliary units, service facilities and yard improvements, as well as land.…”
Section: -1mentioning
confidence: 99%
See 4 more Smart Citations
“…Fixed Capital Investment (FCI) encompassing both direct and indirect costs [31,32]. In particular, for the integration of the Pd/alloy-based CMR module into the above hydrogen production plant, cost components associated with direct costs involve purchased equipment (including WGS reactors, HTS catalysts, and Pd/Au alloy composite membrane tubes), installation, installed instrumentation and controls, installed piping, installed electrical units, buildings, process and auxiliary units, service facilities and yard improvements, as well as land.…”
Section: -1mentioning
confidence: 99%
“…Indirect costs include engineering and supervision pertinent costs, legal expenses, construction expense and contractor's fees, as well as contingency-relevant costs (for a more detailed description please see [9,29,31,32]).…”
Section: -1mentioning
confidence: 99%
See 3 more Smart Citations