2018
DOI: 10.1590/s1413-41522018156436
|View full text |Cite
|
Sign up to set email alerts
|

Gestão de perdas em sistemas de abastecimento de água: uma abordagem construtivista

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0
8

Year Published

2019
2019
2022
2022

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 18 publications
(13 citation statements)
references
References 36 publications
(33 reference statements)
0
5
0
8
Order By: Relevance
“…Ao realizar a conexão entre os conceitos, por meio dos mapas de relações meios-fins e da EHV, é possível determinar clusters que representem e permitem a rotulação daquelas relações, dando origem aos Pontos de Vista do modelo (Kusterko, Ensslin, Ensslin& Chaves, 2018;Matos et al, 2018). A fim de exemplificação, a Figura 4 apresenta o desenvolvimento do Ponto de Vista Fundamental (PVF) "Desempenho", com foco no Ponto de Vista Elementar (PVE) "Infraestrutura".…”
Section: Figura 3 Identificação Das áReas De Preocupação Para O Modelounclassified
See 1 more Smart Citation
“…Ao realizar a conexão entre os conceitos, por meio dos mapas de relações meios-fins e da EHV, é possível determinar clusters que representem e permitem a rotulação daquelas relações, dando origem aos Pontos de Vista do modelo (Kusterko, Ensslin, Ensslin& Chaves, 2018;Matos et al, 2018). A fim de exemplificação, a Figura 4 apresenta o desenvolvimento do Ponto de Vista Fundamental (PVF) "Desempenho", com foco no Ponto de Vista Elementar (PVE) "Infraestrutura".…”
Section: Figura 3 Identificação Das áReas De Preocupação Para O Modelounclassified
“…Para finalizar a Fase de Estruturação do modelo qualitativo de gestão, a Metodologia Multicritério de Apoio à Decisão -Construtivista prevê a etapa de construção dos descritores (Ensslin et al, 2020a;Kusterko et al, 2018;Longaray et al, 2019;Rodrigues et al, 2018), que visa desenvolver escalas ordinais (Matos et al, 2018;Stevens, 1946) para medir o nível de atendimento dos objetivos julgados como adequados pelos decisores (Ensslin et al, 2018). Desta forma, para cada ponto de vista operacional do modelo deve ser construído um indicador de desempenho, composto pelo objetivo a ser medido, escala de medida, níveis de referência e níveis de ancoragem -determinando os níveis bom e neutro.…”
Section: Figura 5 Estrutura Hierárquica De Valor -Foco No Pvf "Desempunclassified
“…When connecting the concepts, through the means-ends relationships maps and the HVS, it is possible to determine clusters that represent and allow the labeling of those relations, giving rise to the Points of View of the model (Kusterko, Ensslin, Ensslin & Chaves, 2018;Matos et al, 2018). In order to exemplify, Figure 4 presents the development of the "Performance" Fundamental Point of View (FPV) focusing on the "Infrastructure" Elementary Point of View (EPV) That way, the "Infrastructure" EPV is broken down into elements to explain it, according to the perceptions of the decision makers.…”
Section: Figure 3 Identification Of Areas Of Concern For the Modelmentioning
confidence: 99%
“…Thus, the model's HVS, exemplified from the "Performance" FPV, is shown in Figure 5. To conclude the Structuring Phase of the qualitative management model, the Multicriteria Decision Aid -Constructivist methodology foresees the stage to construct the descriptors (Ensslin et al, 2020a;Kusterko et al, 2018;Longaray et al, 2019;Rodrigues et al, 2018), which aims to develop ordinal scales (Matos et al, 2018;Stevens, 1946) to measure the level of compliance with objectives deemed appropriate by decision makers (Ensslin et al, 2018). Thus, for each operational point of view of the model, a performance indicator must be developed, composed of the objective to be measured, measurement scale, reference levels and anchoring levels -determining the good and neutral levels.…”
Section: Figure 3 Identification Of Areas Of Concern For the Modelmentioning
confidence: 99%
“…Essa fase acontece por meio de entrevistas com o decisor, a fim de coletar dados a serem utilizados como informações referentes a suas percepções, valores e expectativas quanto à gestão -Elementos Primários de Avaliação (EPAs) e conceitos. Um modelo qualitativo será o resultado final da execução dessa fase inicial da metodologia MCDA-C (Kusterko, Ensslin, Ensslin, & Chaves, 2018).…”
Section: Procedimentos Para Construção Do Modelounclassified