The approx. 3 km long twin‐tube Rudersdorf tunnel is part of the Fürstenfeld Motorway S7. In addition to jet grouting and steel pipe umbrella sections, the excavation is mainly carried out according to the NATM. After the contract had been signed, the contractor proposed a value engineering concept including a stepped (almost) full excavation with a short ring closure. This concept avoids jet grouting sections and reduces sections with steel pipe umbrellas and the temporary top heading invert. A fair risk transfer between both contractual partner enables the full technical and economic potential of the project to be released and guarantees a win‐win situation. The modified construction methodology consequently also requires a change of tasks and responsibility for the contractual partners for the project. This paper highlights the main topics of the contractual modifications required and explains the handling of the ground risk with examples.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.