Alternatives Vortriebskonzept – Verlagerung des Baugrundrisikos beim Tunnel Rudersdorf

Abstract: The approx. 3 km long twin‐tube Rudersdorf tunnel is part of the Fürstenfeld Motorway S7. In addition to jet grouting and steel pipe umbrella sections, the excavation is mainly carried out according to the NATM. After the contract had been signed, the contractor proposed a value engineering concept including a stepped (almost) full excavation with a short ring closure. This concept avoids jet grouting sections and reduces sections with steel pipe umbrellas and the temporary top heading invert. A fair risk tran… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 0 publications
0
0
0
Order By: Relevance