-The construction cost as one of the most important project resources should be planned and used efficiently. Cost estimation can be analyzed using standard of unit price analysis according to Indonesian National Standard (SNI 7394:2008). Related to unit price analysis for tie beam reinforced concrete, the standard mentioned a specific analysis that combine all materials requirement include reinforcement (unit price analysis No. 6.29). In such analysis, reinforcement requirement is stated as much as 200 kg/m 3 of concrete. Considering the diversity of dimension design of building structure caused by geographical location and building function, a further study required to response these problems. This research is aimed to provide information to what extent the unit price analysis related to tie beam reinforced concrete can be applied in cost estimating. Research process initiated with secondary data collection to building construction located in zone 10 and 15 based on earthquake zone map (SNI 1726(SNI :2012
Proyek konstruksi merupakan pekerjaan yang bersifat sementara, tidak berulang, tidak rutin dan ditentukan waktu awal dan akhir, sumber daya terbatas, dan dimaksudkan untuk mencapai sasaran yang ditetapkan. Taksiran anggaran biaya merupakan proses perhitungan volume pekerjaan, harga dari berbagai macam bahan dan pekerjaan yang akan terjadi pada suatu konstruksi. Permasalahan dalam penelitian ini adalah berapa banyak bahan atau material yang diperlukan untuk Pembangunan Proyek Gedung BPJN Tahap III-Banda Aceh. Penelitian ini bertujuan untuk menghitung jumlah material yang diperlukan untuk Pembangunan Proyek Gedung BPJN Tahap III-Banda Aceh. perencanaan atau perhitungan biaya material dan jumlah material berdasarkan Analisa Harga Satuan Pekerjaan (AHSP) 2016. Data yang diperlukan dalam penelitian ini yaitu data sekunder. Rencana hasil penelitian ini adalah perencanaan biaya material yang dibutuhkan dalam pembangunan proyek gedung BPJN Tahap III-Banda Aceh. Manfaatnya adalah sebagai masukan dalam merencanakan bahan dan biaya material dalam pembangunan proyek gedung di masa yang akan datang.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
hi@scite.ai
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.