e conversion section of the cross passage and shaft is a priority concern in the stress transformation of a tunnel structure during subway underground excavation. In the construction of Subway Line 5 in Xi'an, China, the main line in the loess layer was constructed through the cross passage from the subway shaft of the Yue Deng Pavilion-San Dian Village Station tunnel section. Numerical simulation and field measurement were adopted to study the construction stability of the cross passage and shaft under two possible construction methods: the "shaft followed by cross passage construction" method and the "cross passage parallel shaft construction" method. e results showed that the surface deformation and plastic zone of the surrounding rock are similar under the two construction methods. However, of the two, the "cross passage parallel shaft construction" method was more advantageous in controlling the structural deformation of the original shaft and the stress distribution of the horsehead structure.e field monitoring data showed that the surface settlements and the deformation of the original shaft structures meet the requirement of control standards under the "cross passage parallel shaft construction" method.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.