Today there are many multicriteria evaluation methods used in building projects. They enable to make component (complex) evaluations of the task.
Before a multicriteria evaluation of building facade complex process we develop a technological network model which represents technological systems and work performance variants graphically. We use technological network model junctions “cut” method for finding faster final result, for reducing alternative decisions number and facilitating calculations. This method permits to reject not irrational variants from calculations.
Facade painting model consists of the following partial processes: surface preparing, priming, putting and painting. Making multicriteria decisions synthesis all these processes are interpreted as stages. It's necessary to determine the importance of each stage with respect to another stage (stage significance). To find stage significance it's possible to use expert, pair comparison methods, etc. Each stage consists of a certain number of alternatives. For comparison and evaluation of these alternatives, we produce a system of criteria (technical-economical indicators and qualitative characteristics).
Using technological network junctions “cut” method, decision multistage synthesis method and carrying out multicriteria evaluation, it is possible to make a more precise alternative decisions analysis, evaluating the stage significance. This is very important for customers, contractors, projectors, etc.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.