Pump operating as turbine (PAT) is an effective source of reducing the equipment cost in small hydropower plants. However, the manufacturers provide poor information on the PAT performance thus representing a limit for its wider diffusion. Additional implementation difficulties arise under variable operating conditions, characteristic of water distribution networks (WDNs). WDNs allow to obtain widespread and globally significant amount of produced energy by exploiting the head drop due to the network pressure control strategy for leak reductions. Thus a design procedure is proposed that couples a parallel hydraulic circuit with an overall plant efficiency criteria for the market pump selection within a WDN. The proposed design method allows to identify the performance curves of the PAT that maximizes the produced energy for an assigned flow and pressure-head distribution pattern. Finally, computational fluid dynamics (CFD) is shown as a suitable alternative for performance curve assessment covering the limited number of experimental data.
In the management of water distribution networks, large energy savings can be yielded by exploiting the head drop due to the network pressure control strategy, i.e., for leak reductions. Hydropower in small streams is already exploited, but technical solutions combining efficiency and economic convenience are still required. In water distribution networks, an additional design problem comes out from the necessity of ensuring a required head drop under variable operating conditions, i.e., head and discharge variations. Both a hydraulic regulation (HR)-via a series-parallel hydraulic circuit-and an electrical regulation (ER)-via inverter-are feasible solutions. A design procedure for the selection of a production device in a series-parallel hydraulic circuit has been recently proposed. The procedure, named VOS (Variable Operating Strategy), is based on the overall plant efficiency criteria and is applied to a water distribution network where a PAT (pump as a turbine) is used in order to produce energy. In the present paper the VOS design procedure has been extended to the electrical regulation and a comparison between HR and ER efficiency and flexibility within a water distribution network is shown: HR was found more flexible than ER and more efficient. Finally a preliminary economic study has been carried out in order to show the viability of both systems, and a shorter payback period of the electromechanical equipment was found for HR mode.
Abstract:In hydropower, the exploitation of small power sources requires the use of small turbines that combine efficiency and economy. Banki-Michell turbines represent a possible choice for their simplicity and for their good efficiency under variable load conditions. Several experimental and numerical tests have already been designed for examining the best geometry and optimal design of cross-flow type machines, but a theoretical framework for a sequential design of the turbine parameters, taking full advantage of recently expanded computational capabilities, is still missing. To this aim, after a review of the available criteria for Banki-Michell parameter design, a novel two-step procedure is described. In the first step, the initial and final blade angles, the outer impeller diameter and the shape of the nozzle are selected using a simple hydrodynamic analysis, based on a very strong simplification of reality. In the second step, the inner diameter, as well as the number of blades and their shape, are selected by testing single options using computational fluid dynamics (CFD) simulations, starting from the suggested literature values. Good efficiency is attained not only for the design discharge, but also for a large range of variability around the design value. OPEN ACCESSEnergies 2013, 6 2363
Pressure control is one of the main techniques to control leakages in Water Distribution Networks (WDNs) and to prevent pipe damage, improving the delivery standards of a water supply systems. Pressure reducing stations (PRSs) equipped by either pressure reducing valves or motor driven regulating valves are commonly used to dissipate excess hydraulic head in WDNs. An integrated new technical solution with economic and system flexibility benefits is presented which replaces PRSs with pumps used as turbines (PATs). Optimal PAT performance is obtained by a Variable Operating Strategy (VOS), recently developed for the design of small hydropower plants on the basis of valve time operation, and net return determined by both energy production and savings through minimizing leakage. The literature values of both leakages costs and energy tariffs are used to develop a buisness plan model and evaluate the economic benefit of small hydropower plants equipped with PATs. The study shows that the hydropower installation produces interesting economic benefits, even in presence of small available power, that could encourage the leakage reduction even if water savings are not economically relevant, with consequent environmental benefits.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
hi@scite.ai
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.