a b s t r a c tThe variability of wind power will be an increasing challenge for the power system as wind penetration grows and thus needs to be studied. In this paper a model for generation of hourly aggregated wind power time series is described and evaluated. The model is based on MERRA reanalysis data and information on wind energy converters in Sweden. Installed capacity during the studied period (2007 e2012) increased from around 600 to over 3500 MW. When comparing with data from the Swedish TSO, the mean absolute error in hourly energy was 2.9% and RMS error was 3.8%. The model was able to adequately capture step changes and also yielded a nicely corresponding distribution of hourly energy. Two key factors explaining the good results were the use of a globally optimised power curve smoothing parameter and the correction of seasonal and diurnal bias.Because of bottlenecks in the Swedish transmission system it is relevant to model certain areas separately. For the two southern areas the MAE were 3.7 and 4.2%. The northern area was harder to model and had a MAE of 6.5%. This might be explained by a low installed capacity, more complex terrain and icing losses not captured in the model.
We show that Swedish wind turbines constructed before 2007 lose 0.15 capacity factor percentage points per year, corresponding to a lifetime energy loss of 6%. A gradual increase of downtime accounts for around one third of the deterioration and worsened efficiency for the remaining. Although the performance loss in Sweden is considerably smaller than previously reported in the UK, it is statistically significant and calls for a revision of the industry practice for wind energy calculations. The study is based on two partly overlapping datasets, comprising 1,100 monthly and 1,300 hourly time series spanning 5–25 years each.
Ethiopia has huge wind energy potential. In order to be able to simulate the power system operation, hourly time series of wind power is needed. These can be obtained from ERA5 data but first a realistic model is needed. Therefore, in this paper ERA5 reanalysis data were used to model wind power production at two topographically different and distant regions of Ethiopian wind farms—Adama II and Ashegoda. Wind speed was extracted from the ERA5 nearest grid point, bi-linearly interpolated to farms location and statistically down-scaled to increase its resolution at the site. Finally, the speed is extrapolated to hub-height of turbine and converted to power through farm specific power curve to compare with actual data for validation. The results from the model and historical data of wind farms are compared using performance error metrics like hourly mean absolute error (MAE) and hourly root mean square error (RMSE). When comparing with data from Ethiopian Electric Power (EEP), we found hourly MAE and RMSE of 2.5% and 4.54% for Adama II and 2.32% and 5.29% for Ashegoda wind farms respectively, demonstrating a good correlation between the measured and our simulation model result. Thus, this model can be extended to other parts of the country to forecast future wind power production, as well as to indicate simulation of wind power production potential for planning and policy applications using ERA5 reanalysis data. To the best of our knowledge, such modeling of wind power production using reanalysis data has not yet been tried and no researcher has validated generation output against measurement in the country.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.