Public transportation between the island seas is one of the economic backbones where Maluku Province is an archipelagic area. Ambon City as the capital of Maluku Province is a city with activities and interactions between communities using public transportation to support daily activities. However, due to the enactment of PSBB (Large-Scale Social Restrictions) from June 23 to November 22, 2020, the number of public transportations (Perwali No. 18) is limited, with odd-even implementations up to passenger restrictions (6 people per trip), resulting in operational costs. Vehicles will increase. This study aims to find out how much the upper and lower limit tariffs are used for the community and students. In this study, the calculation method was used according to the Standards of the Directorate General of Land Transportation (2002) SK 687/AJ.206/DRDJ/2002. The results of the study show that the upper and lower tariff rates for the community in Nusaniwe District are Rp. 16,592 – Rp. 11,061,-; Sirimau District IDR 5,138 – IDR 3,425,-; and Baguala and Teluk Ambon Districts Rp. 25,000 – Rp. 16,666,-. The upper and lower limit rates for students in Nusaniwe District are Rp. 8,296 – Rp. 5,531,-; Sirimau District IDR 2,569 – IDR 1,712,-; and Baguala and Teluk Ambon Districts Rp 12,500 – Rp 8,333,-. Tariffs based on the BOK during the PSBB period ranged from Rp. 25,000 – Rp. 5,138,-, while the real tariff was Rp. 3,000 – Rp. 5,000.
Permasalahan yang sering terjadi dalam proyek konstruksi adalah keterlambatan (delay). Proyek Pembangunan Rumah Susun PEMKOT Tual yang berlokasi di Desa Faunil, Fiditan, Kota Tual dipilih untuk studi kasus karena mengalami keterlambatan progres dalam pelaksanaannya sebesar 10% pada progress 37%. yang menyebabkan total waktu penyelesaian proyek menjadi lebih lama, dengan rencana waktu penyelesaian proyek yaitu 240 hari. Tujuan dari penilitian ini adalah untuk mengetahui besar biaya minimum dan waktu durasi optimum dalam melakukan percepatan dengan metode crashing. Dibantu juga dengan menggunakan Software Primavera 6.0 untuk menentukan lintasan kritis proyek serta membuat model simulasi berupa schedule baru setelah dilakukan analisis percepatan. Alternatif percepatan proyek yang digunakan adalah penambahan 2 jam kerja (lembur) dan penambahan 3 jam kerja (lembur). Hasil analisis untuk alternatif penambahan 2 jam kerja (lembur) diperoleh waktu dan biaya optimal 212 Hari dengan efisiensi biaya total sebesar Rp. 2.191.618.219,87, Sedangkan untuk penambahan 3 jam kerja (lembur) diperoleh waktu dan biaya optimal 204 hari dengan efisiensi biaya total sebesar Rp. 2.130.829.206,76. Hasil analisis menunjukan bahwa percepatan proyek dengan alternatif penambahan 3 jam kerja lembur menghasilkan waktu dan biaya total lebih sedikit dibanding dengan alternatif penambahan 2 jam kerja.
Diberlakukan e-procurement karena berbagai kelemahan sistim konvensional yang membuka peluang timbulnya KKN. Hadirnya e-procurement dalam rangka pemanfaatan perkembangan teknologi informasi dalam proses pengadaan barang/jasa serta untuk mewujudkan pelaksanaan pengadaan barang/jasa yang efisien, efektif, adil dan transparansi. Namun e-procurement masih memiliki beberapa kelemahan, hambatan serta permasalahan dalam proses pelaksanaannya. Untuk itu sangat diperlukan evaluasi penerapan e-procurement, dan bagaimana pengaruh penerapan e-procurement terhadap kinerja dan efisiensi pengadaan serta strategi pemerintah kabupaten Maluku Tengah ke depan dalam memberlakukan sistim e-procurement.Hasil dari penelitian yaitu meliputi sistim manajemen kontrol,Kualitas,Kerjasama dengan Mitra Kerja,Hukum dan Peraturan Tentang e-procurement, dan variabel yang berpengaruh dan sangat penting terhadap efisiensi adalah Manajemen Kontrol Data. Sedangkan posisi organisasi (LKPP) yang menjalankan sistim e-procurement dalam situasi memiliki peluang dan kekuatan dalam informasi yang bisa diakses lebih mudah dan luas, proses lelang menjadi cepat, pengadaan yang bersih dan transparan serta mendapatkan hasil pengadaan yang sesui dengan ketentuan/spesifikasi. Strategi yang digunakan guna pengembangan organisasi (LKPP) dalam menjalankan sistim e-procurement adalah Meningkatkan sistim manajemen kontrol data dalam upaya proses pengadaan yang bersih dan transparansi, meningkatkan keberhasilan pada kemampuan sumber daya manusia, Pengembangan dan pemeliharaan infrastruktur TI yang terbagi dalam tiga kelompok: perangkat keras,piranti lunak,jaringan computer untuk mewujudkan aplikasi e-procurement.
Occupational Health and Safety (OHS) is important for the company, because the impact of work accidents and diseases not only harms employees, but also the company both directly and indirectly. OHS is often underestimated because it is considered only a waste of money, therefore it is necessary to analyze the effect of the application of OHS on the cost of building construction project. This research was conducted to determine whether the application of OHS affect the cost of building construction project in the city of Ambon. Data collected in this study are primary and secondary data for contractors to obtain data regarding the application of OHS and OHS financing. The survey result were tested with validity, reliability, descriptive analysis, multiple linear regression test and Likert scale ranking analysis to determine the effect of OHS implementation on building construction project costs, namely OHS costs in Ambon city. The results state that all OHS implementation variables, namely: socialization and promotion of OHS, occupational protective equipment, personal protective equipment, OHS personil, health facility facilities, signs, etc. related to OHS risk control have a joint or overall effect on cost building construction project namely OHS cost and which have the most influence on cost are variable personal protective equipment and OHS personnel, the application of OHS is not fully implemented properly along with its financing where the allocation of application and financing is best seen from company providing protective cap (safety helmet), safety shoes, safety vest, and also the presence of OHS expert in the company and in the event of accident and occupational disease the influence on cost will be even greater. ABSTRAKKeselamatan dan Kesehatan Kerja (K3) merupakan hal yang penting bagi perusahaan, karena dampak kecelakaan dan penyakit kerja tidak hanya merugikan karyawan, tetapi juga perusahaan baik secara langsung maupun tidak langsung. K3 sering di sepelekan karena dianggap hanya membuang biaya, oleh karena itu perlu adanya analisis pengaruh penerapan K3 terhadap biaya proyek konstruksi bangunan gedung. Penelitian ini dilakukan untuk mengetahui apakah penerapan K3 berpengaruh terhadap biaya proyek konstruksi bangunan gedung di kota Ambon. Data yang dikumpulkan pada penelitian ini yaitu data primer dan sekunder kepada para kontraktor untuk memperoleh data mengenai penerapan K3 dan pembiayaan K3. Hasil survey kemudian diuji dengan uji validitas, reliabilitas, analisis deskriptif, uji regresi linear berganda dan analisis ranking skala likert untuk mengetahui pengaruh penerapan K3 terhadap biaya proyek konstruksi bangunan gedung yaitu biaya K3 di kota Ambon. Hasil menyatakan bahwa semua variabel penerapan K3 yaitu: sosialisasi dan promosi K3, alat pelindung kerja, alat pelindung diri, personil K3, fasilitas sarana kesehatan, rambu-rambu, lain-lain terkait pengendalian resiko K3 berpengaruh secara bersama-sama atau secara keseluruhan terhadap biaya proyek konstruksi bangunan gedung yaitu biaya K3 dan ya...
Ambon City is one of the cities whose development is being intensively carried out by the government, therefore many government buildings have been carried out in Ambon City. Many workers are carried heavy work that have the potential to experience hazards, so that a good application of occupational safety and health (SMK3) is needed to reduce risk. This study aims to determine the level of implementation of the occupational safety and health management system in non-modest government building projects in Ambon City. The method used in this study is a quantitative method by observation and interview, this method tends to be descriptive results using Minister of Public Works Regulation No. 9 of 2008 and processed using a Likert Scale as a measure to determine the presentation of the application of SMK3 in the project under study. The results of the study on the first factor, namely regulatory factors and work safety standards which are the most fundamental barriers, are companies imposing sanctions with a percentage of 56.67%, regulatory and operational factors, workers reject hazardous work with a 49.17% presentation on worker factors, the company provides emergency and fire extinguishers fires with a presentation of 48.33% on environmental factors of the project, workers get socialization with presentations of 55.83% on the factors of occupational safety and health management, and the company carries out periodic inspections of 27.50% on safety and health implementation factors.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
hi@scite.ai
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.