Iraq is one of the riparian countries within basins of Tigris-Euphrates Rivers in the Middle East region. The region is currently facing water shortage problems due to the increase of the demand and climate changes. In the present study, average monthly water flow measurements for 15 stream flow gaging stations within basins of these rivers in Iraq with population growth rate data in some of its part were used to evaluate the reality of the current situation and future challenges of water availability and demand in Iraq
Abstract. Iraq is one of the riparian countries within basins of Tigris–Euphrates Rivers in the Middle East region. The region is currently facing water shortage problems due to the increase of the demand and climate changes. In the present study, average monthly water flow measurements for 15 stream flow gaging stations within basins of these rivers in Iraq with population growth rate data in some of its part were used to evaluate the reality of the current situation and future challenges of water availability and demand in Iraq. The results showed that Iraq receives annually 70.29 km3 of water 45.4 and 25.52 km3 from River Tigris and Euphrates respectively. An amount of 18.04 km3 is supplied by its tributaries inside Iraq. The whole amount of water in the Euphrates Rivers comes outside the Iraqi borders. Annual decrease of the water inflow is 0.1335 km3 yr−1 for Tigris and 0.245 km3 yr−1 for Euphrates. This implies the annual percentage reduction of inflow rates for the two rivers is 0.294 and 0.960% respectively. Iraq consumes annually 88.89% (63.05 km3) of incoming water from the two rivers, where about 60.43 and 39.57% are from Rivers Tigris and Euphrates respectively. Water demand increases annually by 0.896 km3; of which 0.5271 and 0.475 km3 within Tigris and Euphrates basins respectively. The average water demand in 2020 will increase to 42.844 km3 yr−1 for Tigris basin and for Euphrates 29.225 km3 yr−1 (total 72.069 km3 yr−1), while water availability will decrease to 63.46 km3 yr−1. This means that the overall water shortage will be restricted to 8.61 km3.
Reservoirs are usually exposed to sediment accumulation problems that will lead to reduction in their storage capacity. This problem directly affects the performance of the dams and causes shortage of their useful life. The simplest technique to estimate sediment deposition rate is using sediment rating curve with sediment trapping efficiency (TE) of the reservoir. Many empirical and semi-empirical approaches have been suggested for to determine this term depending on the annual inflow rate, reservoir characteristics and features of the catchments area. In this study six different empirical methods depending on the residence time principle (water retention time) were used. These approaches were reviewed and applied to determine TE of Mosul dam reservoir (MDR) for period 1986 to 2011. The monthly operating data for inflow, outflow and water elevations for MDR were used to determine monthly TE and long-term TE for whole period of MDR using the mentioned methods. Furthermore, the monthly inflow rate for River Tigris upstream MDR, its sediment rating curve and sediment feeding from valleys around MDR were used to estimate the amount sediment coming to the reservoir. The results provided by these methods for TE with sediment coming to MDR were used to compute the amount of sediment deposited in MDR on monthly bases during this period. The results obtained were evaluated using observed bathymetric survey data that had been collected in 2011 after 25 years of the operation of the dam. The results showed all the mentioned methods gave convergent results and they were very close to bathymetric survey results for estimating the volume of sediment deposited especially that proposed by Ward which gave 0.368% percentage error. Furthermore, the result computed using monthly TE gave good agreement if compared with that long-term TE where the percentage error was ranging between −3.229% to 1.674% for monthly adopted data and −4.862% to −2.477% for I. E. Issa et al. 191 whole period data. It is believed that this work will help others to use this procedure on other reservoirs.
The sedimentation process is the most important problems that affects directly the performance of reservoirs due to the reduction of the storage capacity and possible problems effecting the operation. Thus periodic assessment of the storage capacity and determining sediment deposition patterns is an important issue for operation and management of the reservoirs. In this study, bathymetric survey results and an analytical approach had been used to assess the characteristics of sedimentation and estimate the useful life of Mosul Reservoir. It is located on the Tigris River in the north of Iraq. The water surface area of its reservoir is 380 km 2 with a designed storage capacity of 11.11 km 3 at a maximum operating level (330 m a.s.l). The dam started operating in 1986. No detailed study was yet carried out to assess its reservoir. The present study indicated that the annual reduction rate in the dead and live storage capacities of the reservoir is 0.786% and 0.276% respectively. The observed results (bathymetric survey) and algebraic formula show approximately that the useful life of Mosul dam reservoir is about 125 years. Furthermore, the stage-storage capacity curves for the future periods (prediction curves) were established using bathymetric survey data.
Abstract:The storage capacity of reservoirs is gradually reduced due to sediment accumulation that causeschanges in the area-storage capacity (ASC) curves. Establishing these curves and predicting their future change is an important issue for planners, designers and operators of dams.Many empirical and semi-empirical approaches have been suggested for establishing and predicting the future changes forthese curves. In this study four empirical and semi-empirical methods wereevaluated and three of them were modified to be used for the prediction of changes in the ASC curves due to sedimentation, based on the existing sedimentation survey data for 11 reservoirs in the USA. For evaluation, these approaches werereviewed and used to determine sedimentation depth and establishing the ASC curves for the Mosul dam reservoir (MDR),which is the biggest hydraulic structure on the River Tigris in northern Iraq. MDR started operating in 1986 with a storage capacity of 11.11 km 3 and a water surface
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
hi@scite.ai
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.