PurposeThe growth of Indian economy has brought with it significant increase in construction activities. These increased construction activities have further highlighted the problem of waste generation on construction sites. The purpose of this paper is to provide important insights and highlight some issues related to the implementation of effective waste management practices on construction sites in India.Design/methodology/approachThis paper presents two cases and results from semi‐structured interviews which shed light on some of the major issues, challenges and drivers associated with the implementation of waste management in construction in India.FindingsOne of the key findings was that client preference and enforcement of existing laws could actually facilitate the implementation of waste minimisation effectively. Some of the practices being followed, and which are gaining more popularity, are waste quantification, waste segregation, and the implementation of 3Rs (reduce, recycle, and reuse). Congested construction sites, sites in heavily built‐up areas with no ability to have an alternate storage or staging location for materials, lack of ownership of waste due to the presence of multiple contractors on the construction site and lack of awareness and education among the construction workforce were regarded as major challenges associated with the implementation of waste minimisation practices in India.Research limitations/implicationsThe cases and the interviewees chosen were through the authors' links with the Indian Green Building Council (IGBC). The cases were LEED registered projects therefore issues dealing with green construction had been taken into account. These cases might not be representative of the entire country, as there are significantly high proportions of construction projects that are not as green, especially in smaller cities in India. However, the two cases do provide important insights and highlight some issues related to the implementation of effective waste management practices on construction sites in India. The individuals interviewed also had link with IGBC. They had been involved with the green building movement in India for a significant length of time. But the length and breadth of their experience gave them the ability to comment on state of the construction sector and its green as well as non‐green practices associated with waste management.Originality/valueThis paper presents an exploratory study which assesses the implementation of waste management practices in the Indian construction industry. It also highlights activities within different stages of a construction project that can lead to more effective waste management in the construction sector.
Purpose This paper presents a bespoke model for understanding off-site construction (OSC) readiness among Indian construction organisations. This model presents 17 variables for discussion, the results from which help support OSC strategic decision-making. Design/methodology/approach Factor analysis was used to investigate the relationship between variables to group them into factors. After identifying 26 different variables, these were reduced to 17 using factor analysis and categorised into four groups. Descriptive statistical analysis and factor analysis using SPSS was used to develop a hierarchy of factors that affect OSC readiness in India. These findings were reinforced by five domain experts to support the results. Findings Minimising on-site duration, ensuring cost and time certainty and transportation issues were identified as the three most important factors, whereas lack of guidance and scepticism were among the lowest factors affecting the Indian OSC sector. Research limitations/implications This research is specifically focused on OSC within the Indian construction sector. As such, data collection, propagation and analysis should be constrained to the population context regarding inference, generalisability and repeatability. Practical implications The proffered OSC readiness model offers OSC practitioners an ability to assess the OSC readiness of construction organisations in India. This includes the evaluation and benchmarking of processes in both strategic and operational phases, including highlighting areas of concern and scope for further development (to achieve optimal advantage of OSC methods). Originality/value Originality rests with the use of factor analysis and descriptive statistical analysis to study the influence of different construction-related factors and variables on the OSC sector in India. This impact readiness model is context-specific to the Indian OSC sector – providing a unique insight into the causal factors and dependencies that can affect the adoption and uptake of modern methods of construction in India.
The version presented here may differ from the published version or from the version of the record. Please see the repository URL above for details on accessing the published version and note that access may require a subscription.
Purpose This paper aims to present an off-site construction (OSC) readiness maturity model for assessing the readiness of offsite construction companies in the Indian construction sector. Design/methodology/approach The research was conducted in three stages. The first stage consisted of a detailed literature review to document 17 different variables affecting the OSC adoption in India. In Stage 2, 15 semi-structured interviews were carried out where the participants were asked to refine those variables for the Indian context and define what would be different levels of attainment. In the third stage, another set of 5 semi-structure interviews was performed to validate the maturity levels and definitions. Findings A three-level OSC readiness maturity model is presented for discussion. This describes 17 variables at different levels of maturity. Practical Implications The proposed OSC readiness maturity model guides construction practitioners in India through a structured process to enable them to assess their OSC readiness in the market. This assessment enables them to evaluate and benchmark their processes through the strategic and operational phases. The maturity model also identifies the areas of concern and the scope for further development or change to secure the optimal advantage of OSC methods. Originality/value The research produced a model to assess the readiness of OSC adoption in the Indian construction sector. Although the model has been applied to the Indian construction sector, it can easily be modified to accommodate other OSM contexts.
Purpose This paper aims to present factors affecting the Indian construction organisations in adopting off-site construction (OSC) methods. Design/methodology/approach An existing readiness maturity model has been used to assess three large organisations in different parts of India. A case study methodology has been adopted in this paper to highlight critical issues in OSC adoption in India. Findings This paper presents three case studies and concludes the Indian construction sectors readiness to adopt the OSC methods. Through the case studies, different issues related to the adoption of OSC have been identified and highlighted for the Indian construction sector. Although the three companies are large, there are several small- and medium-sized enterprises (SME) operating in India's construction sector, and future research shall be needed to review these SMEs. Research limitations/implications This research study is broadly focused on developing and assessing an OSC readiness framework for Indian construction organisations. The research scope and the population for data collection are limited to large construction organisations in India only. Practical implications The proposed OSC readiness maturity model guides construction practitioners in India through a structured process to assess their OSC readiness in the market. This assessment enables them to evaluate and benchmark their processes through the strategic and operational phases. This research will add to the existing knowledge of OSC in India by mapping issues relevant to India's construction industry. The research has provided background on the status of OSC, the drivers and barriers affecting the implementation of OSC techniques in the Indian construction industry. Originality/value Through the three case studies, several factors related to the implementation of OSC methods have been identified and highlighted within the Indian construction sector. Although the model has been applied to the Indian construction sector, it can easily be modified to fit into other areas and similar dynamics and business conditions.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
hi@scite.ai
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.