1985
DOI: 10.1287/mnsc.31.5.599
|View full text |Cite
|
Sign up to set email alerts
|

Work Force Size and Single Shift Schedules with Variable Demands

Abstract: In recent years, labour negotiations for seven-day-week organizations such as hospitals, mining companies and chemical industries have seen an increased emphasis on improving shift schedules. This paper gives an exact lower bound on the number of workers required to satisfy such primary contractual commitments as ensuring that each employee receives at least A out of every B weekends off, everyone works exactly five days per week, and no one works more than six consecutive days. The model addressed is general … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
42
0
1

Year Published

1997
1997
2016
2016

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 111 publications
(43 citation statements)
references
References 6 publications
0
42
0
1
Order By: Relevance
“…Inspired by Burns and Carter [27], a lower bound on the number of nurses required for problem P 1 can be calculated using parameters a and d j (Equation (2.4)).…”
Section: Minimum Number Of Nursesmentioning
confidence: 99%
“…Inspired by Burns and Carter [27], a lower bound on the number of nurses required for problem P 1 can be calculated using parameters a and d j (Equation (2.4)).…”
Section: Minimum Number Of Nursesmentioning
confidence: 99%
“…a minimum number of employees are needed (see e.g. Burns and Carter, 1985). This may explain why shift work is more frequent in larger establishments (Anxo et al, 1995).…”
Section: Shift Workmentioning
confidence: 99%
“…12 They give an algorithm to construct a weekly schedule which minimizes work-force requirements under varying daily loads. They do not consider the assignment problem for individual workers, which is the main issue in the present article.…”
Section: B Related Work On Timetablingmentioning
confidence: 99%