2013
DOI: 10.5121/ijsea.2013.4402
|View full text |Cite
|
Sign up to set email alerts
|

Work Breakdown Structure: A Tool for Software Project Scope Verification

Abstract: ABSTRACT

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2018
2018
2021
2021

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(5 citation statements)
references
References 6 publications
0
5
0
Order By: Relevance
“…WBS is used as a verification tool for project scope. It basically uses user/system requirements and provides resource and task for cost estimation [49]. However, it is limited to gauge the requirements and tasks into deliverable.…”
Section: B Scope Definition Techniques/toolsmentioning
confidence: 99%
See 2 more Smart Citations
“…WBS is used as a verification tool for project scope. It basically uses user/system requirements and provides resource and task for cost estimation [49]. However, it is limited to gauge the requirements and tasks into deliverable.…”
Section: B Scope Definition Techniques/toolsmentioning
confidence: 99%
“…In software projects, modifications are considered agreed upon scope of the project. These modifications are due [5] Agile EVM [26] Burn-down charts [46] Burn-up charts [46] Function Points [48] Work-Breakdown Structure [49] Expert judgement [51] Performance analysis [52] Feature Transition Charts [53] Story Mapping [54] Stakeholder analysis [55] Benefit analysis [56] Requirement Matrix [56] Scope Change Control System [57] Functional Size Measurement (FSM) [58] Feature Survival Charts [59] Feature Growth Charts [60] SPSRI [61] Activity Based (top down) [62]- [63] Task based (bottom up) [62]- [63] PERT [64] Object point [65] Source line of code (SLOC) [65] Analogy technique [65] Price-to-win [62] VOLUME , 2020 to inevitable change and complexity of the project scope. According to [50] author "Half of the system requirements change till deployment".…”
Section: B Scope Definition Techniques/toolsmentioning
confidence: 99%
See 1 more Smart Citation
“…WBS is a process of breaking down from project work into smaller and more manageable components (PMBOK, 2017). WBS is a structured grouping and oriented on the activities and work contained in the project that defines the overall scope of the project (Hans, 2013). WBS is a tool for project management because it provides a basis for planning, scheduling, controlling, assignment of responsibilities and information management thus WBS can be used in any way including care and maintenance (Ibrahim, 2009) (Park & Cai, 2017).…”
Section: Referring To Regulation Of the Ministry Of Public Workmentioning
confidence: 99%
“…Due to the significant role of scope definition in the success of software projects, the literature states various methods and tools that have been established to assist with scope definition. These methods and tools help in identifying the features of scope definition such as Work Breakdown Structure (WBS) [46], controlling scope by dealing with scope changes such as feature break down structure and Feature Transition Charts (FTC) [47], scope verification using WBS [46], [48], and quantifying scope using the given requirements such as Function Points (FP) and Function Size Measurement (FSM) [49], [50]. None of these tools or methods help in defining the scope, although they do help with managing the scope that is already defined.…”
Section: Introductionmentioning
confidence: 99%