Development of Preventive Maintenance Guidelines for Architectural Components on Government Building Based on Work Breakdown Structure

Abstract: To reduce the occurrence of damage to government buildings, the efforts for preventive maintenance work must be made. In a building's preventive maintenance work process, the scope of work can be arranged using Work Breakdown Structure (WBS), so that it becomes structured and activity-oriented. However, in the application of government buildings, there are no guidelines for preventive maintenance work that is standardized by WBS. Therefore, developing guidelines for preventive maintenance work is important to … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
2
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(4 citation statements)
references
References 17 publications
(12 reference statements)
0
2
0
Order By: Relevance
“… WBS Level 5 : Activities Activities were more detailed descriptions from work packages at level 4 which contains steps to accomplished goal that can be monitored by project managers [11,12].…”
Section: Results Of Research Question 1: Wbs Standardsmentioning
confidence: 99%
See 1 more Smart Citation
“… WBS Level 5 : Activities Activities were more detailed descriptions from work packages at level 4 which contains steps to accomplished goal that can be monitored by project managers [11,12].…”
Section: Results Of Research Question 1: Wbs Standardsmentioning
confidence: 99%
“…It's not very necessary to present alternatives in WBS for ease of use on site. All types of design used in the project would mainly be listed in WBS Level 4. WBS Level 5 : Activities Activities were more detailed descriptions from work packages at level 4 which contains steps to accomplished goal that can be monitored by project managers[11,12].…”
mentioning
confidence: 99%
“…Collected data for this study were analysed using SPSS Inc. Ver. 22 and Microsoft Excel 2010 software and interpretations of results were then carried out. Average index analysis was used to utilise the significant level of rank for the respondent's perspectives.…”
Section: Methodsmentioning
confidence: 99%
“…Maintenance is the final stage of a project, which passes due diligence to ensure its safety for users [1]. In addition to providing security, such as building maintenance, bridge maintenance also aims to minimize repair costs [2]. With the aim of safety and minimal repair costs, of course, a priority setting for bridge maintenance is needed.…”
Section: Introductionmentioning
confidence: 99%