Development Of Risk-Based Work Breakdown Structure (WBS) Standards For Integrated Design And Construction Phase On Design-Build Method Of Architectural Works Of High-Rise Building To Improve Construction Safety Performance
Gabby Andina Ganesdhi,
Yusuf Latief,
Danang Budi Nugroho
Abstract:Design-build methods are one of the options in carrying out the construction of high-rise buildings with a high level of uncertainty from design phase to construction, which also affects the safety performance of the project itself. Therefore, a prevention standard for a high-risk event is needed based on project activities. This research was prepared using a descriptive qualitative method with expert validation process through Delphi method and completed with a questionnaire survey to conduct a risk assessmen… Show more
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.