2016
DOI: 10.1016/j.procs.2016.09.124
|View full text |Cite
|
Sign up to set email alerts
|

Why Do Information Technology Projects Fail?

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

2
54
0
5

Year Published

2017
2017
2021
2021

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 47 publications
(61 citation statements)
references
References 8 publications
2
54
0
5
Order By: Relevance
“…Extensive systems with more users are always exposed to human errors; therefore, more time should be spent on all types of tests during the production. As a result, production costs and the need for insurance coverage will increase. Duration of the contract (Alami, ; Cebeci, ; Lopez & Salmeron, ): Long‐term contracts are usually concluded for larger systems, with more details and more complicated production process. Duration of the contract increases the uncertainty.…”
Section: System Overviewmentioning
confidence: 99%
See 2 more Smart Citations
“…Extensive systems with more users are always exposed to human errors; therefore, more time should be spent on all types of tests during the production. As a result, production costs and the need for insurance coverage will increase. Duration of the contract (Alami, ; Cebeci, ; Lopez & Salmeron, ): Long‐term contracts are usually concluded for larger systems, with more details and more complicated production process. Duration of the contract increases the uncertainty.…”
Section: System Overviewmentioning
confidence: 99%
“…Duration of the contract increases the uncertainty. Insurance coverage can compensate this uncertainty to some extent. Work quality/rank of the consultant and supervisor of the contract (Alami, ; Lopez & Salmeron, ; TechInsurance, ): Any professional contract needs a consultant or primary designer and the project needs at least one supervisor. The consultant of technical contracts supervises the execution of that contract.…”
Section: System Overviewmentioning
confidence: 99%
See 1 more Smart Citation
“…Such causes can be linked to the environment in which the project develops, to the "Projects' ecosystems" (Alami, 2016), "Organization structure, Project managers' skills, Communication, Requirement specification, Cultural awareness" )-, the level of the project strategic planning (PapkeShields E. Karen, 2016) the adjustment to the cultural environment in which the project is to be implemented. .…”
Section: Picbe | 950mentioning
confidence: 99%
“…It revealed that the more time spent on using the said Project Management Information System, the better the Cost Performing Index (CPI) of the project [4]. Additionally, Alami's study revealed that small-scaled IT projects are less prone to project failure than larger-scaled IT projects -a possible basis for scaling is the project budget, If the project budget is larger than $350,000 it is considered large-scale project; otherwise a project with a budget of less than $350,000 is considered small-scale project [5].…”
Section: Introductionmentioning
confidence: 99%