DWT 2022
DOI: 10.5004/dwt.2022.28541
|View full text |Cite
|
Sign up to set email alerts
|

Water quality modelling of Sebou River estuary (Morocco) after the installation of the Kenitra town’s WWTP

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

2
4
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(6 citation statements)
references
References 0 publications
2
4
0
Order By: Relevance
“…The results demonstrated that the physicochemical quality of Sebou River estuary does not meet the national standards for discharges into the natural environment, similar results were found by (Nizar & Igouzal, 2022a;Nizar et al, 2022c) which also demonstrated the good impact of the treatment plant on the attenuation of BOD 5 in the river, analogous results were obtained by (Nizar et al, 2022b). The simulations provided other answers such as the release dispersion and the residence time in the estuary.…”
Section: Introductionsupporting
confidence: 75%
See 4 more Smart Citations
“…The results demonstrated that the physicochemical quality of Sebou River estuary does not meet the national standards for discharges into the natural environment, similar results were found by (Nizar & Igouzal, 2022a;Nizar et al, 2022c) which also demonstrated the good impact of the treatment plant on the attenuation of BOD 5 in the river, analogous results were obtained by (Nizar et al, 2022b). The simulations provided other answers such as the release dispersion and the residence time in the estuary.…”
Section: Introductionsupporting
confidence: 75%
“…Before 2020, water was discharged without prior treatment through six collectors into Sebou estuary (Nizar & Igouzal, 2022a). Therefore, the main aim of constructing the wastewater treatment plant (WWTP) in Kenitra was to convey the wastewaters and to put them under treatment, thus making WWTP the only discharge point for Sebou estuary (Nizar et al, 2022b). This study tends to model Sebou estuary water quality and simulate the future of the discharges from the six collectors before installation of the WWTP, and simulate the future of the discharges from the WWTP after their installation (Nizar et al, 2022b).…”
Section: Introductionmentioning
confidence: 99%
See 3 more Smart Citations