2013
DOI: 10.1002/we.1640
|View full text |Cite
|
Sign up to set email alerts
|

Variability and uncertainty of wind power in the California electric power system

Abstract: The California generation fleet manages the existing variability and uncertainty in the demand for electric power (load). When wind power is added, the dispatchable generators manage the variability and uncertainty of the net load (load minus wind power). The variability and uncertainty of the load and the net load are compared when 8790 MW of wind power are added to the California power system, a level expected when California achieves its 33% renewable portfolio standard, using a data set of 26,296 h of sync… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2016
2016
2022
2022

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 16 publications
(7 citation statements)
references
References 26 publications
0
7
0
Order By: Relevance
“…Wind power forecasting through stochastic techniques (especially WD) has been a very important topic for researchers, power producers, and planning engineers. It enhances the share of wind power in meeting the load demand [37]. The basic formula for probability density function (PDF) f (v, v 0 , β) of WD in its most basic form is given in Equation (2).…”
Section: Weibull Distribution (Wd) For Wind Power Forecastingmentioning
confidence: 99%
“…Wind power forecasting through stochastic techniques (especially WD) has been a very important topic for researchers, power producers, and planning engineers. It enhances the share of wind power in meeting the load demand [37]. The basic formula for probability density function (PDF) f (v, v 0 , β) of WD in its most basic form is given in Equation (2).…”
Section: Weibull Distribution (Wd) For Wind Power Forecastingmentioning
confidence: 99%
“…An analysis and assessment of the short-term variability of wind energy (from minutes to several hours) are the most important. Hourly, four-hour and 12-hour variations can be predicted and therefore can be taken into account when planning the loading of power plants in the electric power system [15,16].…”
Section: Variability Assessment Of Wind Power Generationmentioning
confidence: 99%
“…126 She maintains that the ICJ gave a clear answer in Greece v Turkey (the Aegean Sea Continental Shelf case), 127 confirming that all agreements delimiting the continental shelf fall within the exception provided for in VCLT Article 62(2)(a). 128 The Court stated that:…”
Section: Application Of Vclt Article 62 In Relation To Maritime Bmentioning
confidence: 99%