2022
DOI: 10.1016/j.renene.2022.03.131
|View full text |Cite
|
Sign up to set email alerts
|

Value of demand flexibility for managing wind energy constraint and curtailment

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 28 publications
(6 citation statements)
references
References 23 publications
0
3
0
Order By: Relevance
“…The fleet would operate at hours and areas of the farm which are prone to bat collisions, usually known from surveys made prior to and following construction. Within this time frame, activation should start at turbine cut‐in speed (determined by manufacturer and power grid requirements, Agbonaye et al., 2022) and stop at the maximal wind speed of bat activity in the specific area and season. This scheme will enable economic use of the infrastructure and will set well‐defined boundaries, known a priori in each facility, enabling practical assessment of the utility of the suggested method.…”
Section: Discussionmentioning
confidence: 99%
“…The fleet would operate at hours and areas of the farm which are prone to bat collisions, usually known from surveys made prior to and following construction. Within this time frame, activation should start at turbine cut‐in speed (determined by manufacturer and power grid requirements, Agbonaye et al., 2022) and stop at the maximal wind speed of bat activity in the specific area and season. This scheme will enable economic use of the infrastructure and will set well‐defined boundaries, known a priori in each facility, enabling practical assessment of the utility of the suggested method.…”
Section: Discussionmentioning
confidence: 99%
“…Heat pump heating profiles were taken from the datasets of the Renewable Heat Premium Payment (RHPP) trial [22] weather conditions have an effect on the results in addition to building age and fabrics. In order to regroup these parameters, the heating profiles have been generated by clustering all houses that match the given combination [23]. The dataset includes metadata describing the kind of heat pump, the tenure and the type of dwelling of each site.…”
Section: Heat Pump Heating Profiles Of the Buildings In The Ukmentioning
confidence: 99%
“…It is now established that Northern Ireland has significant wind power integration challenges, currently being addressed by electricity network constraints and wind power curtailment [10]. There are plans to strengthen the electricity network, and storage has been muted, e.g., batteries, etc.…”
Section: Introductionmentioning
confidence: 99%