Valuation of measurement data for low voltage network expansion planning

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
11
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 11 publications
(11 citation statements)
references
References 16 publications
0
11
0
Order By: Relevance
“…The advanced metering infrastructures (AMI) are installed at the customer's premises to update the power consumption to the distribution system operators. Also, the distribution system operators communicate with the parking lot controller through a wide area network [30]. The FLIA is based on the services of fuzzy logic inference mechanism which comprehensively solve the complicated temporal varying inputs from the smart grid and inputs from the EVs and determine an accurate charging and/or discharging decision for each of the connected EVs.…”
Section: B Proposed System Model Of Fliamentioning
confidence: 99%
See 1 more Smart Citation
“…The advanced metering infrastructures (AMI) are installed at the customer's premises to update the power consumption to the distribution system operators. Also, the distribution system operators communicate with the parking lot controller through a wide area network [30]. The FLIA is based on the services of fuzzy logic inference mechanism which comprehensively solve the complicated temporal varying inputs from the smart grid and inputs from the EVs and determine an accurate charging and/or discharging decision for each of the connected EVs.…”
Section: B Proposed System Model Of Fliamentioning
confidence: 99%
“…The total power load of the low-voltage distribution system can be obtained by summing-up the baseload and the PL load at any time t, as expressed by Eq. (30).…”
Section: Problem Formulation and The Proposed Algorithmmentioning
confidence: 99%
“…To overcome this limitations, pseudo-measurements are used [8], [2]. The key disadvantage of pseudo-measurements is the potential error propagation from the pseudo-measurement to the output of the DSSE, error which increases the level of uncertainty of the results [9].…”
Section: Challenges and Motivationmentioning
confidence: 99%
“…As a result, high granularity demand power data will come at a cost to UK DNOs. An example method to meet this requirement is to aggregate the demand power data for >1 nearby households on the LV circuit [2]. However, to ensure its applicable for DSSE, aggregation should be done for those on the same phase.…”
Section: Introductionmentioning
confidence: 99%
“…On the other hand, the level of supplied voltage is also of great relevance to the distribution company, and not only because of consumer complaints. It is well known that voltage control allows utilities to improve the operation efficiency of their networks by minimizing power losses [14], taking advantage of conservation voltage reduction [15], delaying new investments [16], and so on.…”
Section: Introductionmentioning
confidence: 99%