2022
DOI: 10.1016/j.ymssp.2021.108380
|View full text |Cite
|
Sign up to set email alerts
|

Validation of vibration-based structural health monitoring on retrofitted railway bridge KW51

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
26
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
5
3
1

Relationship

0
9

Authors

Journals

citations
Cited by 71 publications
(26 citation statements)
references
References 23 publications
0
26
0
Order By: Relevance
“…In particular, for this case, we investigate if the effect of a sudden application of the concentrated load P can be observed from the data set. The description of both methods in the following subsections is borrowed from [31] and is repeated here for the sake of completeness.…”
Section: Anomaly Detectionmentioning
confidence: 99%
See 1 more Smart Citation
“…In particular, for this case, we investigate if the effect of a sudden application of the concentrated load P can be observed from the data set. The description of both methods in the following subsections is borrowed from [31] and is repeated here for the sake of completeness.…”
Section: Anomaly Detectionmentioning
confidence: 99%
“…Ψ = U 1 . The number of principal components n c accounted for in the PCA is generally determined from the model misfit in the training and the validation stages, as outlined in [31]. In the present numerical study, only the first three (out of 18) principal components have been retained (n c = 3).…”
Section: Linear Pcamentioning
confidence: 99%
“…The retrofit was completed on 27th September 2019. Novelty detection has been successfully performed on this dataset using robust principal component analysis (PCA) and linear regression methods [33]. For a complete overview of the dataset the reader is referred to [20].…”
Section: Z24 and Kw51 Datasetsmentioning
confidence: 99%
“…During the monitoring campaign, each diagonal member was retrofitted with a steel box to strengthen the design of the bridge, with the retrofit beginning on the 15 th of May 2019 and completed on the 27 th of September 2019. Novelty detection of the retrofit has been successfully demonstrated using robust PCA and linear regression trained on the pre-retrofit data [70]. For a full description of the dataset, the reader is referred to [43].…”
Section: Datasetsmentioning
confidence: 99%