2016 6th IEEE International Conference on Control System, Computing and Engineering (ICCSCE) 2016
DOI: 10.1109/iccsce.2016.7893555
|View full text |Cite
|
Sign up to set email alerts
|

Utilizing optimal control and physical measurements when developing operator assist, automatic functions and autonomous machines

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
5
0

Year Published

2018
2018
2018
2018

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(5 citation statements)
references
References 8 publications
0
5
0
Order By: Relevance
“…A secondary result is that the optimal control algorithm is ready to be used as input to operator assist systems, automatic functions and autonomous construction machine control [24]. Once the DEM simulations have been simulated in advance they can be used as a library, then the computation time for the optimization takes around 4 hours on a laptop.…”
Section: Discussionmentioning
confidence: 99%
See 3 more Smart Citations
“…A secondary result is that the optimal control algorithm is ready to be used as input to operator assist systems, automatic functions and autonomous construction machine control [24]. Once the DEM simulations have been simulated in advance they can be used as a library, then the computation time for the optimization takes around 4 hours on a laptop.…”
Section: Discussionmentioning
confidence: 99%
“…This can be done by operator support systems, automatic functions or autonomous machines. Even if the method presented here will not directly deliver such systems, the results from the optimal control calculations can be used as input when developing them [24], hence the dashed circle in Figure 3. In addition, the "Work cycle optimization" will affect the "Operator optimization".…”
Section: Work Cyclementioning
confidence: 99%
See 2 more Smart Citations
“…Even though DP is not implementable in human-operated machines, given that the entire work cycle must be known in advance, it has been used to design and tune other types of controllers, 13,14 as well as to provide benchmark results for known work cycles. 15 Yet it must be noted that DP determines the optimum based on a discretised model and is therefore only as optimal as the modelling accuracy allows. In fact, the performance of a real system might be highly suboptimal with any model-based controller if the model itself has significant uncertainties.…”
Section: Introductionmentioning
confidence: 99%