Using Risk-based Simulation Models to Assist in Planning Deepwater Exploration and Production Programs West of Shetland and in the Gulf of Mexico

Abstract: This paper describes the use of process simulation models to evaluate alternative drilling programs, and specifically to quantify the band of uncertainty in time and cost. The discussion also includes consideration of the interaction between the drilling program and the selection, design and installation of the process facilities. It is recognized that deepwater drilling operations are complex and risky endeavors. The cost of these drilling operations can represent a very significant proporti… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
5
0

Year Published

2004
2004
2009
2009

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(5 citation statements)
references
References 0 publications
0
5
0
Order By: Relevance
“…The occurrence of a hurricane warning or alarm is enough to disrupt drilling operations and a significant amount of operating time can be lost to ''false alarms'' (Barrilleaux et al, 2001;Corona et al, 1996;Rowe et al, 2001). In deepwater operations, loop currents and the eddies may damage drilling strings/risers and impact the drilling schedule (Epps, 1997).…”
Section: Decision Modelmentioning
confidence: 98%
“…The occurrence of a hurricane warning or alarm is enough to disrupt drilling operations and a significant amount of operating time can be lost to ''false alarms'' (Barrilleaux et al, 2001;Corona et al, 1996;Rowe et al, 2001). In deepwater operations, loop currents and the eddies may damage drilling strings/risers and impact the drilling schedule (Epps, 1997).…”
Section: Decision Modelmentioning
confidence: 98%
“…Weather downtime can impact drilling operations in various ways; e.g., weather too severe for operations involving supply boats may lead to delay if stock levels on the rig decline to a critical level; weather may impact anchoring up and moving time; weather may be too severe for drilling to occur; and extreme weather may result in damaged or lost drill strings and risers. If operating limits are exceeded because wave heights, ocean currents, or eddies are too strong, drilling operations will be temporarily abandoned and resumed when conditions fall within the operating capabilities of the equipment [25]. Waiting on weather WOW time needs to be considered separate from the drilling time and cost metrics.…”
Section: Weathermentioning
confidence: 99%
“…The occurrence of a hurricane warning or alarm is enough to disrupt drilling operations, and a significant amount of operating time can be lost to "false alarms" [18][19][20]. In deepwater operations, loop currents and eddies associated with them are also common phenomena that may damage drilling strings/risers and impact the drilling schedule [21].…”
Section: Decision Modelmentioning
confidence: 99%
“…The Outer Continental Shelf (OCS) 20 of the Gulf of Mexico (GOM) is the most extensively developed and mature offshore petroleum province in the world. More than 40,000 wells have been drilled in the OCS since offshore production began in 1947, and there are currently over 4,000 active structures in water depths ranging up to 7,000 ft. About 25 percent of the United States domestic oil and gas supply comes from the OCS, and in 2002, OCS lands averaged daily production of about 1.6 million barrels (MMbbl) of oil and 14.5 billion cubic feet (Bcf/d) of natural gas.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation